Tender Details

Particulars Details
Title
Internal And External Repainting Work Of Transit Camp At 765/400 K V Padghe Gis
Description
Internal And External Repainting Work Of Transit Camp At 765/400 K V Padghe Gis
Organisation Power Grid Corporation of India Limited | Central Govt. Ministry/Department
Tender Id 23898
Reference
Number
WR-1/CNM/PS/I-3017A:2023/ Rfx-5005009615
Tender Fee 0
EMD 6000
Tender Value
Place 765/400 kV Padghe GIS Sub-station
Link https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=82f6101f-0c58-4017-90d1-de6565cb33e1
Start Date March 11, 2024 17:10
End Date

26/03/2024 ( Expired 424 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Read more
Leasing of commercial space and maintenance of entire new building at cbs sindhi camp jaipur

Leasing of commercial space and maintenance of entire new building at cbs sindhi camp jaipur

Read more
Construction of 400 seater working women hostel

Construction of 400 seater working women hostel at new shillong township, mawdiangdiang, and 200 seater each working women hostel at jowai,byrnihat, tura in meghalaya

Read more
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Read more
Supply, installation, testing and commissioning of lift work at pro posed 3rd floor entrance at nmrc head office, ganga shopping, com plex, sector-29, noida.

Supply, installation, testing and commissioning of lift work at pro&amp#x0d posed 3rd floor entrance at nmrc head office, ganga shopping, com&amp#x0d plex, sector-29, noida.

Read more
Periodical and round the clock maintenance job of 4 x 12.75 mw tg sets and associated electromechanical installations within power house, 132 kv substation, forebay, intake and tailrace at rhp, stage ii for 24 months

Periodical and round the clock maintenance job of 4 x 12.75 mw tg sets and associated electromechanical installations within power house, 132 kv substation, forebay, intake and tailrace at rhp, stage ii for 24 months

Read more
Painting work of main store, ffph, water tank, sprs, parking shed, pump house, guest house and external of b and c type quarter at 400/220kv samba substation j and k

Painting work of main store, ffph, water tank, sprs, parking shed, pump house, guest house and external of b and c type quarter at 400/220kv samba substation j and k

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise