Tender Details
Particulars | Details |
---|---|
Title |
Erection, Extn, Di Of 6.6k V Ohl For Supplying Power To 6.6k V Rated Excavators, Advancement Of Working Faces At Q.No. 01 For Overburden Removal And Coal Production Along With Dismantling Of 6.6k V Ohl From Old Working Face/ Patch At Q No. 01
|
Description |
Erection, Extn, Di Of 6.6k V Ohl For Supplying Power To 6.6k V Rated Excavators, Advancement Of Working Faces At Q.No. 01 For Overburden Removal And Coal Production Along With Dismantling Of 6.6k V Ohl From Old Working Face/ Patch At Q No. 01
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 17100 |
Tender Value | |
Place | Purnadih OCP, NK Area |
Link |
AAAAAAAAAA Login to view |
Start Date | May 30, 2025 16:30 |
End Date |
09/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Erection, extn, di of 6.6kv ohl for supplying power to 6.6kv rated excavators, advancement of working faces at q.no. 01 for overburden removal and coal production along with dismantling of 6.6kv ohl from old working face/ patch at qno. 01
Erection, extn, di of 6.6kv ohl for supplying power to 6.6kv rated excavators, advancement of working faces at q.no. 01 for overburden removal and coal production along with dismantling of 6.6kv ohl from old working face/ patch at qno. 01
Read moreDi, erection and dismantling of 6.6kv benidih feeder advancing of face maa ambey outsourcing patch power supply motor pump box cut-iii and maa ambey feeder breaker of abocp mine
Di, erection and dismantling of 6.6kv benidih feeder advancing of face maa ambey outsourcing patch power supply motor pump box cut-iii and maa ambey feeder breaker of abocp mine
Read moreDismantling, erection and extn of 6.6kv/3.3kv, 440v/230v oh line in mine supplying power to hemms, mine dewatering pumps and lighting installations and maintenance of 6.6kv, 3.3kv and 440v/230v oh line for one year on as and when req under kdh ocp
Dismantling, erection and extn of 6.6kv/3.3kv, 440v/230v oh line in mine supplying power to hemms, mine dewatering pumps and lighting installations and maintenance of 6.6kv, 3.3kv and 440v/230v oh line for one year on as and when req under kdh ocp
Read moreDi of 3.3kv ohtl from tanker point to face pump due to hindrance in coal stock and dismantling of 3.3kv ohtl from view point to old working face of shovel under dakra project, nk area
Di of 3.3kv ohtl from tanker point to face pump due to hindrance in coal stock and dismantling of 3.3kv ohtl from view point to old working face of shovel under dakra project, nk area
Read moreExtn cum erection including di of 220/440v lt ohl req for illumination at different locations and as and when required for mine development and along with dismantling of lt ohl from different locations at quarry no. 01 and 02 under purnadih
Extn cum erection including di of 220/440v lt ohl req for illumination at different locations and as and when required for mine development and along with dismantling of lt ohl from different locations at quarry no. 01 and 02 under purnadih
Read more(a) repairing and maintenance of 3.3kv o/h line to feeding power of chitahi basti (b) di of 6.6kv o/h line due to widening of transporting haul road and ob dump and dismantling of idle 6.6kv o/h line from socp old coal face of amp colliery.
(a) repairing and maintenance of 3.3kv o/h line to feeding power of chitahi basti (b) di of 6.6kv o/h line due to widening of transporting haul road and ob dump and dismantling of idle 6.6kv o/h line from socp old coal face of amp colliery.
Read moreDismantling, transporting and installation of two 4000gpm pump motor from old sump to new sump at jarlahi coal face along with erection its pipe line at phularitand under amp colliery.
Dismantling, transporting and installation of two 
 4000gpm pump motor from old sump to new sump 
 at jarlahi coal face along with erection its pipe line at 
 phularitand under amp colliery.
Read more(a) repairing and maintenance of 3.3kv o/h line to feeding power of chitahi basti (b) di of 6.6kv o/h line due to widening of transporting haul road and ob dump and dismantling of idle 6.6kv o/h line from socp old coal face of amp colliery.
(a) repairing and maintenance of 3.3kv o/h line to feeding power of chitahi basti (b) di of 6.6kv o/h line due to widening of transporting haul road and ob dump and dismantling of idle 6.6kv o/h line from socp old coal face of amp colliery.
Read moreSupply erection, testing and commissioning of new control cum protection panel for hv side of 66 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt- lalitpur.
Supply erection, testing and commissioning of new control cum protection panel for hv side of 66 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt- lalitpur.
Read moreErection cum extension of lighting lt ohl from point near sarna sthal towards hospital patch along the periphery of working area at hospital patch for illumination and subsequently dismantling the lt ohl from non working area as and when required
Erection cum extension of lighting lt ohl from point near sarna sthal towards hospital patch along the periphery of working area at hospital patch for illumination and subsequently dismantling the lt ohl from non working area as and when required
Read moreof your Industry type