Tender Details

Particulars Details
Title
Onsite Repair Cum Prive Maintenance Of The 11 K V By 3.3 K V 2 Mva Sr. No. 458 A 4, East India Electricals Make Transformer, Installed At The 11 K V By 3.3 K V Main Substation Of Karo Ocp, Under Bn K Area.
Description
Onsite Repair Cum Prive Maintenance Of The 11 K V By 3.3 K V, 2 Mva Sr. No. 458 A 4 East India Electricals Make Transformer, Installed At The 11 K V By 3.3 K V Main Substation Of Karo Ocp Under Bn K Area.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_303881_1
Reference
Number
P.E. (EnM)/ Karo OCP/ e-tender/ 2023-24/ 74
Tender Fee 0
EMD 2700
Tender Value -
Place P.O. Bermo, Dist. Bokaro, Jharkhand 829104
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=314790

Start Date March 07, 2024 17:25
End Date
Expired 13/03/2024

Expired 947 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Work of loading of 400kv,220kv, 315 mva transformer from 400kv substation bareilly and carriage, unloading at 400 kv substation orai

Work of loading of 400kv-220kv, 315 mva transformer from 400kv substation bareilly and carriage, unloading at 400 kv substation orai

Read more
Construction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines

Construction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines

Read more
Extension of 765/400 kv champa substation under the transmission scheme augmentation of transformation capacity at 765/400 kv champa substation by installation of 1500 mva, 765/400 kv ict (7th ict on bus section-b)

Extension of 765/400 kv champa substation under the transmission scheme augmentation of transformation capacity at 765/400 kv champa substation by installation of 1500 mva, 765/400 kv ict (7th ict on bus section-b)

Read more
(a) diversion of 550v over head line at mla colony (out site of pit limit) (b) diversion of 3.3 kv over head line (3.3 pump side) at nirsa ocp, mugma area.

(a) diversion of 550v over head line at mla colony (out site of pit limit) (b) diversion of 3.3 kv over head line (3.3 pump side) at nirsa ocp, mugma area.

Read more
Work of replacement of old 8 mva and 6.3 mva power transformers with 20mva and 10 mva power transformers respectively at 33/11 kv mapusa substation along with associated equipments under the jurisdiction of sub divisioni divisionvi mapusa

Work of replacement of old 8 mva and 6.3 mva power transformers with 20mva and 10 mva power transformers respectively at 33/11 kv mapusa substation along with associated equipments under the jurisdiction of sub divisioni divisionvi mapusa

Read more
A installation and commissioning of 3.3 kv ngr in two nos merson s make 01 mva transformer installed at kalimati and shivmandir substation bearing sl no 11221 and 28672 respectively of chapapur colliery b installation and commissioning of 02 nos. 550

A installation and commissioning of 3.3 kv ngr in two nos merson s make 01 mva transformer installed at kalimati and shivmandir substation bearing sl no 11221 and 28672 respectively of chapapur colliery b installation and commissioning of 02

Read more
Single phase auto transformers to 220/132 kv gis substation at paonta sahib (4 nos.) , 220/132 kv ais substation at kala amb (3 nos.), district sirmour and 53.33/66.67 mva, 220/132/11 kv, single phase auto transformers to 220/132 kv ais s/stn at kuni

Single phase auto transformers to 220/132 kv gis substation at paonta sahib (4 nos.) , 220/132 kv ais substation at kala amb (3 nos.), district sirmour and 53.33/66.67 mva, 220/132/11 kv, single phase auto t/fs to 220/132 kv ais s/stn at kunihar

Read more
Urgent supply installation testing and commissioning of 33 kv a.b. switch gear for 5 mva substation at 160 mld salauli water treatment plant.

Urgent supply installation testing and commissioning of 33 kv a.b. switch gear for 5 mva substation at 160 mld salauli water treatment plant.

Read more
Annual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months alongwith the renovation of lightning protection system of main substation, laiyo substation and mines at

Annual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months along with the renovation of lightning protection system of main substation, laiyo substation and mines at

Read more
Work of design manufacturing supply erection testing and commissioning of electrical plus civil work for 2x12.5 mva 33 by11 kv indoor substation at imt rohtak pss 2 substation haryana on turnkey basis

Work of design manufacturing supply erection testing and commissioning of electrical plus civil work for 2x12.5 mva 33 by11 kv indoor substation at imt rohtak pss 2 substation haryana on turnkey basis

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise