Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 34(thirty Four) Nos. Isolation Stopping Around Proposed S 2 Depillaring Panel In Sripur (R Vi) Seam Of Bejdih Colliery.
|
| Description |
Construction Of 34(thirty Four) Nos. Isolation Stopping Around Proposed S 2 Depillaring Panel In Sripur (R Vi) Seam Of Bejdih Colliery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_282007_1 |
|
Reference Number |
ECL/SDPA/GM/Sur/e-Tender/2023/ 1957 dt.20.06.2023 |
| Tender Fee | - |
| EMD | 51400 |
| Tender Value | - |
| Place | Online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | June 26, 2023 21:30 |
| End Date |
Expired
06/07/2023
Expired 1197 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.
Read moreConstruction of 10 (ten) nos. ventilation stopping for 53r/30l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area
Construction of 10 (ten) nos. ventilation stopping for 53r/30l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area
Read moreConstruction of 14 numbers of isolation stopping in k-12 panel (sub panel k-12a and k-12b) in r-iv seam at khottadih colliery, pandaveswar area.
Construction of 14 numbers of isolation stopping in k-12 panel (sub panel k-12a and k-12b) in r-iv seam at khottadih colliery, pandaveswar area.
Read moreConstruction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.
Read moreDrill chuck zero to ten mm of portable drill machine,condensor coil twenty eight into thirty of window ac one point five ton,air guide five two three eight ar of window ac one point five ton,evaporator coil thirty into thirty two of window ac one point five ton,mosfet irfb seven five four five of inverter,mirco controlled sw twenty four sgh vi r three of inverter,regulator ic seven eight zero five of inverter,bucking pad gex one fifty,bucking pad gex one twenty five,dead nut five by eight inch window ac window ac,dead nut one by four window ac window ac,dead nut one by two inch split ac split ac,dead nut one by four split ac split ac,gear gws six hundred of hand grinder six fifty watt
Drill chuck zero to ten mm of portable drill machine,condensor coil twenty eight into thirty of window ac one point five ton,air guide five two three eight ar of window ac one point five ton,evaporator coil thirty into thirty two of window ac one point five ton,mosfet irfb seven five four five of inverter,mirco controlled sw twenty four sgh vi r three of inverter,regulator ic seven eight zero five of inverter,bucking pad gex one fifty,bucking pad gex one twenty five,dead nut five by eight inch window ac window ac,dead nut one by four window ac window ac,dead nut one by two inch split ac split ac,dead nut one by four split ac split ac,gear gws six hundred of hand grinder six fifty watt
Read moreConstruction of 04(four) nos. sectionalization stopping in western side of sripur (r-vi) seam of bejdih colliery
Construction of 04(four) nos. sectionalization stopping in western side of sripur (r-vi) seam of bejdih colliery
Read moreConstruction of 16(sixteen) nos. of isolation stopping around proposed s3 depillaring panel in sirpur (r-vi) seam of
Construction of 16(sixteen) nos. of isolation stopping around proposed s3 depillaring panel in sirpur (r-vi) seam of 
 bejdih colliery
Read moreRoof bolting at proposed depillaring panel s-3 at travelling road of sripur(r-vi) seam of bejdih colliery
Roof bolting at proposed depillaring panel s-3 at travelling road of sripur(r-vi) seam of bejdih colliery
Read moreReplastering of isolation stoppings in sripur (r-vi) seam at chapuikhas colliery
Replastering of isolation stoppings in sripur (r-vi) seam at chapuikhas colliery
Read moreConstruction of 15 nos. sectionalisation stopping in sripur(r-vi) seam of methani colliery
Construction of 15 nos. sectionalisation stopping in sripur(r-vi) seam of methani colliery
Read moreof your Industry type