Tender Details

Particulars Details
Title
Providing Protective Coating And Patch Repair Works In Cold Water Tunnel Of Unit Ii During Annual Overhauling Period
Description
Providing Protective Coating And Patch Repair Works In Cold Water Tunnel Of Unit Ii During Annual Overhauling Period
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_602935_1
Reference
Number
CE /NCTPS-I/SE/ CM/74/2025-26
Tender Fee 0
EMD 58900
Tender Value -
Place CE/NCTPS-I
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=720733

Start Date September 11, 2025 23:30
End Date
Expired 25/09/2025

Expired 381 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years

Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years

Read more
Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27

Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27

Read more
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27

Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27

Read more
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27

Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27

Read more
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27

Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27

Read more
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type