Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Protection To Eroded Slope Of Left Bank In The U/S Of Anandapur Barrage Near Village Sadangi And Bank Protection Near Padmapur And Restoration Of Disturbed Protected Banks On Both Sides.
|
| Description |
Protection To Eroded Slope Of Left Bank In The U/S Of Anandapur Barrage Near Village Sadangi And Bank Protection Near Padmapur And Restoration Of Disturbed Protected Banks On Both Sides.
|
| Organisation | CCE,Anandapur Barrage Project | State Govt. and UT |
| Tender Id | 2024_CCEAB_107345_1 |
|
Reference Number |
CCEABP-05 of 2024-25 |
| Tender Fee | 10000 |
| EMD | 45.68 Lakh |
| Tender Value | - |
| Place | SALAPADA |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=517230 |
| Start Date | November 21, 2024 17:00 |
| End Date |
Expired
11/12/2024
Expired 672 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of a bridge cum barrage across the malaprabha river at chikkahattiholi village, khanapur taluk, belagavi district along with allied works including sopanam, left bank protection and connecting roads from chikkahattiholi and karvinkoppa villages together with operation and maintenance for a period of 5 years
Construction of a bridge cum barrage across the malaprabha river at chikkahattiholi village, khanapur taluk, belagavi district along with allied works including sopanam, left bank protection and connecting roads from chikkahattiholi and karvinkoppa villages together with operation and maintenance for a period of 5 years
Read moreProtection to eroded slope of left bank in the u/s of anandapur barrage near village sadangi and bank protection near padmapur and restoration of disturbed protected banks on both sides.
Protection to eroded slope of left bank in the u/s of anandapur barrage near village sadangi and bank protection near padmapur and restoration of disturbed protected banks on both sides.
Read moreSlope protection at left bank klhep
Preventive measures for slope protection at left bank above the dam deck of hatidubi dam klhep
Read moreProtection of both side bank slope in reservoir area near barrage structure at tld-iii power station
Protection of both side bank slope in reservoir area near barrage structure at tld-iii power station
Read moreSlope protection on both sides of padmapur distributary from rd 8.920 km to 9.100 km.
Canal maintenance works
Read moreSlope protection on both sides of padmapur distributary from rd 8.920 km to 9.100 km.
Canal maintenance
Read moreSlope protection at heavy cutting zone of padmapur distributary between rd 9.850 km to 10.100 km.
Canal maintenance
Read moreUrgent protection work to the eroded right bank of chalakudy river
Urgent protection work to the&#x0d eroded right bank of chalakudy river near&#x0d water authority pump house at upstream of&#x0d koodapuzha check dam in chalakudy&#x0d municipality
Read moreImprovement to the waterway by construction of protection wall to the eroded bank of
Improvement to the waterway&#x0d by construction of protection&#x0d wall to the eroded bank of&#x0d assonora par in river in&#x0d sy.no. 74/0 situated at&#x0d sirigao village of bicholim&#x0d taluka
Read moreToe protection work at right bank of d/s of ithai barrage.
Toe protection work at right bank of d/s of ithai barrage.
Read moreof your Industry type