Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Approaches Covering For Water Logging At Level Crossings 🚦🌊 The Ministry Of Railways, Specifically The Central Govt. Ministry/Department, Has Issued A Tender For The Complete Deion And Execution Of Covering Approaches To Prevent Pr Water Logging At Level Crossings No. 10, 15, 17, And 22 On The Rok Pnp Section Under Aden/Rok. 📅 Submission Deadline: May 31, 2024, 3:00 Pm Interested Contractors Must Submit A Tender Security Of Inr 3,28,900. No Tender Fee Is Payable. Detailed Tender Documents Must Be Referred To For Comprehensive Project Specifications, Scope, And Requirements. Keywords: Ministry Of Railways, Water Logging, Level Crossings, Rok Pnp Section, Aden/Rok, Tender, Procurement, Infrastructure Development| Particulars | Details |
|---|---|
| Title |
Covering Of Approaches To Pr Water Logging Of Lhs On Level Crossing No. 10,15,17 And 22 Rok Pnp Section Under Aden/Rok.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74147611 |
|
Reference Number |
NIT21-W-IV-24-25 |
| Tender Fee | 0 |
| EMD | 3.29 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74147611/viewNitPdf_4511079.pdf |
| Start Date | May 09, 2024 00:13 |
| End Date |
Expired
31/05/2024
Expired 867 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconditioning of cms crossing using robotic welding machine on re-bti, rok-bnw & re-sdlp sections in the jurisdiction of den/east under control of aden/bhiwani.
Reconditioning of cms crossing using robotic welding machine on re-bti, rok-bnw & re-sdlp sections in the jurisdiction of den/east under control of aden/bhiwani.
Read moreRe-conditioning of cms crossing, tongue rail and cup welds in the re-bti, rok-bnw & re-sdlp section in the jurisdiction of den/east under control of aden/ssa.
Re-conditioning of cms crossing, tongue rail and cup welds in the re-bti, rok-bnw & re-sdlp section in the jurisdiction of den/east under control of aden/ssa.
Read moreLaunching of box segments in c/with construction of lhs (5m x 5m) in lieu of unmanned level crossing no. c-85a at km 117.492 on ldh- fzr section under aden-1/fzr.
Launching of box segments in c/with construction of lhs (5m x 5m) in lieu of unmanned level crossing no. c-85a at km 117.492 on ldh- fzr section under aden-1/fzr.
Read moreElectrical (general) work in connection with improvement with up-gradation of existing subway by providing roof covering of both approaches, cleaning of sump & water storage reservoir of br. no. 82, 101, 102, 107, 109, 112, 116, 124, 127 and 165 under jurisdiction of aden/bdc.
Electrical (general) work in connection with improvement with up-gradation of existing subway by providing roof covering of both approaches, cleaning of sump & water storage reservoir of br. no. 82, 101, 102, 107, 109, 112, 116, 124, 127 and 165 under jurisdiction of aden/bdc.
Read moreConstruction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Read moreTrd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Read moreCovering of approaches to pr water logging of lhs on level crossing no. 10,15,17 and 22 rok-pnp section under aden/rok.
For complete deion and other details, please refer to tender
Read moreCovering of approaches to pr water logging of lhs on level crossing no. 17 on rok-pnp section under aden/rok
For complete deion and other details, please refer to tender
Read moreCovering of approaches to pr water logging of lhs on level crossing no. 15 on rok-pnp section under aden/rok
For complete deion and other details, please refer to tender
Read moreCovering of approaches to pr water logging of lhs on level crossing no. 10 on rok-pnp section under aden/rok
For complete deion and other details, please refer to tender
Read moreof your Industry type