| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Iv Complete Inspection Of Mill Internals Reconditioning Renewal Of Worn Out Parts And Bearings Replacement Of Worn Out Worm Wheel With Worm Shaft If Necessary And Renewal Of Worm Gear Hub Etc
|
| Description |
Mtps I Mill Plant Unit Iv Complete Inspection Of Mill Internals Reconditioning Renewal Of Worn Out Parts And Bearings Replacement Of Worn Out Worm Wheel With Worm Shaft If Necessary And Renewal Of Worm Gear Hub Etc
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_425062_1 |
|
Reference Number |
CE / MTPS-I / SE/ M-I /MP/OT. 438/2023-24 |
| Tender Fee | 0 |
| EMD | 6700 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=505297 |
| Start Date | February 14, 2024 23:45 |
| End Date |
Expired
20/02/2024
Expired 966 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreMtps i bm unit ii boiler aoh 2026 reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
Mtps i bm unit ii boiler aoh 2026 reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
Read moreMtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Read moreTtps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Ttps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover etc
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and rectification of critical pipe line of crh etc
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Mtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Read moreMtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreTtps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Ttps mech ii bm full reconditioning of worn out coal nozzle tips released from unit iii boiler during 2026 2027 overhaul
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 maintenance of burners and replacement of worn out fasteners at cover plates
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of burners and replacement of worn out fasteners at cover plates