Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
One Time Improvement Of Bypassed Stretches Of The Towns Chundi, Voletivaripalem, Badevaripalem And Kandukur From Km. 143.320 To Km.189.050 Of Nh 167 B In The State Of Andhra Pradesh On Epc Mode
|
| Description |
One Time Improvement Of Bypassed Stretches Of The Towns Chundi, Voletivaripalem, Badevaripalem And Kandukur From Km. 143.320 To Km.189.050 Of Nh 167 B In The State Of Andhra Pradesh On Epc Mode
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_862571_1 |
|
Reference Number |
SENHVJA/07/2025-26 Dated.30.05.2025 |
| Tender Fee | 11800 |
| EMD | 9.07 Lakh |
| Tender Value | |
| Place | Andhra Pradesh |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=906913 |
| Start Date | June 02, 2025 22:30 |
| End Date |
Expired
24/07/2025
Expired 333 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreConstruction of six lane external port connectivity road from the junction of nh 65 and nh 216 to machilipatnam port via machilipatnam bypass section of nh 216 in the state of andhra pradesh
Construction of six lane external port connectivity road from the junction of nh 65 and nh 216 to machilipatnam port via machilipatnam bypass section of nh 216 in the state of andhra pradesh
Read moreImprovement of road stretches on nh_17 from coronation bridge (km 595.20 of old nh_31) to manpong (km 597.00 )of old nh31
Improvement of road stretches on nh_17 from coronation bridge (km 595.20 of old nh_31) to manpong (km 597.00 of old n.h.31) in the district of kalimpong, west bengal.
Read moreBeautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Beautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreof your Industry type