Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Proposed Repaire Work Of New Water Works Office In Old Durdarshan Kendra At Kolhapur Road Sangli Wn.18
|
Description |
Proposed Repaire Work Of New Water Works Office In Old Durdarshan Kendra At Kolhapur Road Sangli Wn.18
|
Organisation | Sangli Miraj Kupwad Municipal Corporation | State Govt. and UT |
Tender Id | 2025_SMKMC_1155528_3 |
Reference Number |
PWD_16_2024_2025 |
Tender Fee | 1250 |
EMD | 11719 |
Tender Value | |
Place | SMKC |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2010385 |
Start Date | March 01, 2025 21:30 |
End Date |
10/03/2025 ( Expired 101 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreConstruction of proposed 18 tpd municipal wet and dry waste processing plant, leachate tank with rain water harvesting unit...other ancillary works for proposed 18 tpd municipal waste processing plant under swm project within baruipur municipality.
Construction of proposed 18 tpd municipal wet and dry waste processing plant, leachate tank with rain water harvesting unit...other ancillary works for proposed 18 tpd municipal waste processing plant under swm project within baruipur municipality.
Read moreConstruction of additional building for district police office building with development works at erode in erode district.
Construction of additional building for district police office building with development works at erode in erode district.
Read moreRepair and maintenance of perimeter security lights, street lights, solar lights and solar water heater and other misc works in non domestic area at 58su af station chimney hills
Repair and maintenance of perimeter security lights, street lights, solar lights and solar water heater and other misc works in non domestic area at 58su af station chimney hills
Read moreWork of renewal and replacement of damaged roof paint electrical wiring joinery water supply sanitary and other allied civil works at ce border zone pspcl amritsar
Work of renewal and replacement of damaged roof paint electrical wiring joinery water supply sanitary and other allied civil works at ce border zone pspcl amritsar
Read moreNagarjuna sagar left canal power house
Procurement and installation of a new microprocessor based electronic governor in place of the existing asea make turbine governor and runner blade controller hpc600 including its design manufacture supply inspection and testing at manufacturer s works before dispatch delivery along with mandatory spares erection cabling termination testing and commissioning and its integration with the existing mechanical electro hydraulic control unit e40m duly dis-assembling of existing complete ehgc governor control panel i e electronic panel only in the control room along with its old cables for unit-2 at nslcph nagarjunasagar telangana
Read moreDevelopment of dharmshala yatri niwas and also furniture work in room at old tahsil office premises for cm parli vaijnath dist beed
Development of dharmshala yatri niwas and also furniture work in room at old tahsil office premises for cm parli vaijnath dist beed
Read moreof your Industry type