Tender Details
Particulars | Details |
---|---|
Title |
Balance Work Of Construction Of Eklavya Model Residential School (Emrs) Phase I At Gurabandha Block Dist. Purbi Singhbhum In The State Of Jharkhand On
|
Description |
Balance Work Of Construction Of Eklavya Model Residential School (Emrs) Phase I At Gurabandha Block Dist. Purbi Singhbhum In The State Of Jharkhand On Risk And Cost Of Previous Agency
|
Organisation | Hindustan Steelworks Construction Limited | Public Sector Undertakings |
Tender Id | 366 |
Reference Number |
HSCL/ZH/E-II/RNC/EMRS/Gurabandha/2025/e-003 |
Tender Fee | 7670 |
EMD | 6.01 Lakh |
Tender Value | |
Place | Hindustan Steelworks Construction Limited-HEAD OFFICE-West Bengal-Kolkata |
Link | https://hscl.enivida.com/ |
Start Date | April 24, 2025 17:39 |
End Date |
08/05/2025 ( Expired 30 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024
Construction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreIe services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read moreConstruction of 50 bedded critical care block (g plus 2) within the campus of district hospital, balurghat in the district of dakshin dinajpur during the year 2022-23, balance work.
Construction of 50 bedded critical care block (g plus 2) within the campus of district hospital, balurghat in the district of dakshin dinajpur during the year 2022-23, balance work.
Read moreAnnual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.
Annual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.
Read moreConstruction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under barasat highway division no.-i in the district of north
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under bhd no.-i in n 24pgs ei work for compound illu and beau.
Read moreof your Industry type