Tender Details

Particulars Details
Title
Estt For Ptr Augmentation From 3.15 Mva To 5 Mva At 33/11 Kv Bhairababa S/.S And Removed Ptr 3.15 Mva Used Addl/. Ptr At Dangarwada Under O And M Vidisha And Basoda
Description
Estt For Ptr Augmentation From 3.15 Mva To 5 Mva At 33/11 Kv Bhairababa S/.S And Removed Ptr 3.15 Mva Used Addl/. Ptr At Dangarwada Under O And M Vidisha And Basoda
Organisation Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1313
EMD 35591
Tender Value
Place SSTD Work Bhairababa to Dangwada Aug.
Link

AAAAAAAAAA

Login to view
Start Date April 18, 2025 23:30
End Date

24/04/2025 ( 4 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Ce/ds/e-tender/2025-26/01/01 date 02-04-2025

Drawl of a new 33kv line with htls conductor(acsr panther equivalent), conductor augmentation from acsr wolf to htls conductor(acsr panther equivalent) and con of 11kv to 33kv line with htls conductor(acsr panther equivalent)at barjora,bankura

Read more
Water supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0

Water supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0

Read more
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl

Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl

Read more
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Read more
Construction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka

Construction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka

Read more
Augmentation of 132kv substation laksar from 3x40 mva transformer to 2x40 mva and 1x80 mva transformer at 132kv voltage level

Augmentation of 132kv substation laksar from 3x40 mva transformer to 2x40 mva and 1x80 mva transformer at 132kv voltage level

Read more
Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.

Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.

Read more
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise