Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Cutting Jointing Of 100mm Di Water Supply Pipe Line Back Side Of Haffed In Sector 5 Panchkula
|
Description |
Providing And Laying Cutting Jointing Of 100mm Di Water Supply Pipe Line Back Side Of Haffed In Sector 5 Panchkula
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2025_HBC_435152_1 |
Reference Number |
2025BC51B3A9 1751 4AC3 9544 1BBA5DB8E4A8269HSV |
Tender Fee | 1430 |
EMD | 3380 |
Tender Value | |
Place | Panchkula |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=512368 |
Start Date | March 20, 2025 21:50 |
End Date |
27/03/2025 ( Expired 72 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreProvn of new bore well replacement of old gi pipe line to di pipe and certain facility at itr colony balasore under ge (i) rnd
Provn of new bore well replacement of old gi pipe line to di pipe and certain facility at itr colony balasore under ge (i) rnd
Read moreSupply, installation, trenching /hdd/ clamping, laying of duct, blowing of ofc through ducts, splicing, testing and commissioning for ofc replacement in ndls-rewari section of railtel.
Supply, installation, trenching /hdd/ clamping, laying of duct, blowing of ofc through ducts, splicing, testing and commissioning for ofc replacement in ndls-rewari section of railtel.
Read moreSpecial repair for con of old vintage ci pipe line to di pipe line and replacement of old unserviceable gi pipe, valve etc at various location of mcmm under ge (east) jabalpur
Special repair for con of old vintage ci pipe line to di pipe line and replacement of old unserviceable gi pipe, valve etc at various location of mcmm under ge (east) jabalpur
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreProviding and laying of hdpe pipe line at ward 03 and 05 from bypass road boi to tarapur bypass road
Providing and laying of hdpe pipe line at ward 03 and 05 from bypass road boi to tarapur bypass road
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at barakar health centre zone-24 kulti under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at barakar health centre zone-24 kulti under amrut&#x0d 2.0 phase-iii within amc
Read moreof your Industry type