Tender Details
Particulars | Details |
---|---|
Title |
Repairing And Rehabilitation Of Concrete Structures, Cooling Towers And Chemical Pits At Panipat Refinery And Petrochemical Complex
|
Description |
Repairing And Rehabilitation Of Concrete Structures, Cooling Towers And Chemical Pits At Panipat Refinery And Petrochemical Complex
|
Organisation | IndianOil | Central Govt. Ministry/Department |
Tender Id | 2025_PR_184809_1 |
Reference Number |
RPRC251128 |
Tender Fee | 0 |
EMD | 42300 |
Tender Value | |
Place | Panipat Refinery |
Link | https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=195066 |
Start Date | May 03, 2025 14:30 |
End Date |
12/05/2025 ( Expired 28 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreRfp for engagement of firms for marketing operation and maintenance of cold storage facilities and storage facility for fruits vegetables and grains at the food and agro processing centre at panipat
Rfp for engagement of firms for marketing, operation and maintenance of cold storage facilities and storage facility for fruits, vegetables and grains at the food and agro processing centre at panipat haryana lump sum annual amount to be quoted by
Read moreDesign and construction of metro station entry/exit structures integrated with commercial spaces and connecting through link bridge at sholinganallur and thoraipakkam station
Design and construction of metro station entry/exit structures integrated with commercial spaces and connecting through link bridge at sholinganallur and thoraipakkam station
Read moreConstruction of community toilet (sulabh complex) at bus stand in ward no 08 and near shri dada dhuni darwar in ward no. 02 in nagar parishad, sainkheda
Construction of community toilet (sulabh complex) at bus stand in ward no 08 and near shri dada dhuni darwar in ward no. 02 in nagar parishad, sainkheda
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreOutsourcing the services of housekeeping, security, gardening etc for tti complex including hostels at tti, pspcl patiala and providing part time sweeper and part time mali for zkc, pspcl amritsar and kc, pspcl bathinda under hrd org for yr 25_26
Outsourcing the services of housekeeping security gardening etc. for tti complex including hostels at tti pspcl patiala and providing part time sweeper and part time mali for zkc pspcl amritsar and zkc pspcl bathinda under hrd org for yr 25_26
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreDevelopment of residential towers and community center including allied work at 37 d, green view apartments, gurugram on design, engineering, procurement and construction (epc) basis including operation and maintenance of 5 years
Development of residential towers and community 
 center including allied work at 37 d, green view 
 apartments, gurugram on design, engineering, 
 procurement and construction (epc) basis including 
 operation and maintenance of 5 years
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreof your Industry type