Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Track Parameters Measurement Work For Recording The Track Geometry Parameters Of Yard Lines &Amp Block Section Of Durg Taroki And Dhadhapara Durg Section (Approx 320 Kms) By Track Geometry Measurement Trolley
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78895470 |
Reference Number |
E-R-T-99-24-25 |
Tender Fee | 0 |
EMD | 89300 |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78895470/viewNitPdf_4799196.pdf |
Start Date | January 01, 2025 00:19 |
End Date |
23/01/2025 ( Expired 157 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
For complete yard cleaning of active and non-active yard by spraying of weed killer solution (with material) and cutting uprooting of rubbish grass, shrub, creepers bushed etc. throwing it outside from the periphery area of substation
For complete yard cleaning of active and non-active yard by spraying of weed killer solution (with material)&#x0d and cutting uprooting of rubbish grass, shrub, creepers bushed etc. throwing it outside from the periphery&#x0d area of substation.
Read moreBiennial work contract for sprinkling of water by contractor own tractor with trolley from main gates to chp 210 mw track hopper area of atps mppgcl chachai.
Biennial work contract for sprinkling of water by contractor own tractor with trolley from main gates to chp 210 mw track hopper area of atps mppgcl chachai.
Read moreSupply of electrical materials for the work of ame for iei and eei to all institutions, lt/ht oh lines etc, pertaining to ae (elec)-kkc section of esd-north, tirumala for the year 2025-26(part-b)
Supply of electrical materials for the work of ame for iei and eei to all institutions, lt/ht oh lines etc, pertaining to ae (elec)-kkc section of esd-north, tirumala for the year 2025-26(part-b)
Read moreSupply of electrical materials for the work of ame for iei and eei to all institutions, lt/ht oh lines etc, pertaining to ae electrical- cro section in esd-east, tirumala for 2025-26(part-b)
Supply of electrical materials for the work of ame for iei and eei to all institutions, lt/ht oh lines etc, pertaining to ae electrical- cro section in esd-east, tirumala for 2025-26(part-b)
Read moreService contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp
Service contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp&#x0d &#x0d &#x0d
Read moreSupply of electrical materials for the work of ame for iei and eei to all institutions, lt ht oh lines etc, pertaining to ae-elec-anc section of esd-south,tirumala for the year 2025-26(part-b)
Supply of electrical materials for the work of ame for iei and eei to all institutions, lt ht oh lines etc, pertaining to ae-elec-anc section of esd-south,tirumala for the year 2025-26(part-b)
Read moreSupply of electrical materials for the work of ame for iei and eei to all institutions, lt/ht oh lines etc, pertaining to ae (elec)-vqc section of esd-west, tirumala for the year 2025-26(part-b)
Supply of electrical materials for the work of ame for iei and eei to all institutions, lt/ht oh lines etc, pertaining to ae (elec)-vqc section of esd-west, tirumala for the year 2025-26(part-b)
Read moreAnnual maintenance of sewerage scheme in sector 9a bahadrugarh
Work for cleaning choked semi choked of sewer lines by bucket type sewer cleaning machine of sewerage network of sector 9a bahadurgarh and all other works contingent thereto
Read moreWork of before the of the crushing season, spread the bagasse from the stock of bagasse available in the bagasse yard and dry it by turning it over system trail of all three boilers and feeding bagasse in the bagasse carrier for running the m
Work of before the of the crushing season, spread the bagasse from the stock of bagasse available in the bagasse yard and dry it by turning it over system trail of all three boilers and feeding bagasse in the bagasse carrier for running the m
Read moreMajor and minor and maintenance reparing work of india mark ii handpump by providind skilled unskilled labour block bamori distt guna for period 12 months
Major and minor and maintenance reparing work of india mark ii handpump by providind skilled unskilled labour block bamori distt guna for period 12 months
Read moreof your Industry type