Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Autonomous Human Lung Ventilation Training And Testing System
|
| Description |
|
| Organisation | Department of Science and Technology (DST) | Ministry of Science and Technology |
| Tender Id | GEM/2024/B/4703063 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 29, 2024 20:21 |
| End Date |
Expired
14/03/2024
Expired 842 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | MAVERICK SIMULATION SOLUTIONS LIMITED | Make : Maverick Model : AutoHumanLungVentilation Training And Testing sys Title : Autonomous Human Lung Ventilation Training And Testing System | 13-03-2024 12:58:36 | Start-up | MII MSE | Qualified |
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | MAVERICK SIMULATION SOLUTIONS PRIVATE LIMITED(MII) | Item Categories : Autonomous Human Lung Ventilation Training and Testing System | 49100000.00 | L1 |
Contract Details
- Contract Status:
- Order Accepted
- Seller:
- MAVERICK SIMULATION SOLUTIONS PRIVATE LIMITED
- Buyer Designation:
- buyer1
- Buying Mode:
- Bid/RA
- Contract Date:
- 2024-03-21 21:08:00 +0530
- Contract Amount:
- 47025000
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Autonomous Human Lung Ventilation Training And Testing System | Maverick | AutoHumanLungVentilation Training And Testing sys | 1 | ₹ 47025000.000 |
Supply installation testing commissioning of multi modal imaging system
Multi modal imaging system with confocal and flim capability
Read moreExpression of interest of equipment for setting up a 2mwh cell fabrication line for cylindrical and prismatic cells supply, installation, commissioning, demonstration, testing, training of 2mwh cell fabrication line
Expression of interest of equipment for setting up a 2mwh cell fabrication line for cylindrical and prismatic cells supply, installation, commissioning, demonstration, testing, training of 2mwh cell fabrication line
Read moreUpgradation and modernization of critical infrastructure work at hydro power training centre nangal punjab.
Upgradation and modernization of critical infrastructure work at hydro power training centre nangal punjab.
Read moreSupply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.
Supply installation testing commissioning operation and maintenance of centralized control and monitoring system ccms for highway lighting on national highways under r and b nh wing goa on five 05 year contract basis.
Read moreSupply, installation, commissioning and testing of cleaning and grading machinery (2 tph)
Supply, installation, commissioning and testing of cleaning and grading machinery (2 tph)
Read moreConstr of tk road crossing between a veh loading point and tankodrome training area near fasf at nams
Constr of tk road crossing between a veh loading point and
 tankodrome training area near fasf at nams
Read moreDesign fabrication supply erection testing and commissioning of double girder eot crane 8 ton capacity span 6 m to 8 m and required lift including complete lt assembly and required bus bar dsl shrouded contactor system including foundation
Design fabrication supply erection testing and commissioning of double girder eot crane 8 ton capacity span 6 m to 8 m and required lift including complete lt assembly and required bus bar dsl shrouded contactor system including foundation 3a
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreSupply and installation of femtosecond laser system.
Supply and installation of femtosecond laser system.
Read moreSupply, installation, testing and commissioning of lifting tackle complete assembly of 25/5 ton capacity
For complete deion and other details, please refer to tender
Read moreof your Industry type