Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Instrumentation Limited Make Pneumatic Power Cylinders, Actuators And Spares Of Actuators Installed In Various Systems Of Plant For Imd 4, Stps, Sarni.
|
Description |
Procurement Of Instrumentation Limited Make Pneumatic Power Cylinders, Actuators And Spares Of Actuators Installed In Various Systems Of Plant For Imd 4, Stps, Sarni.
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_MPPGC_291219_1 |
Reference Number |
PE-1476 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | SARNI |
Link | https://mptenders.gov.in |
Start Date | July 18, 2023 00:25 |
End Date |
24/07/2023 ( Expired 685 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Purchase of various single phase ac/dc transducers and multifunction meters for davr and ht/lt switchgear ph-4, stps sarni
Purchase of various single phase ac/dc transducers and multifunction meters for davr and ht/lt switchgear ph-4, stps sarni
Read moreProcurement of ash slurry density meter installed in silo area at ahp for imd-4, stps, sarni.
Procurement of ash slurry density meter installed in silo area at ahp for imd-4, stps, sarni.
Read moreCamc for 03 (three) years, for hvac systems of make as m/s carrier air conditioning and refrigeration limited (formerly m/s toshiba ltd), installed at elevated stations and office of pmrp
Comprehensive annual maintenance contract (camc) for 03 (three) years, for hvac systems of make as m/s carrier air conditioning and refrigeration limited (formerly m/s toshiba ltd), installed at elevated stations and office of
Read moreProcurement of phosphate analyzer for swas system for imd-4, stps sarni
Procurement of phosphate analyzer for swas system for imd-4, stps sarni
Read moreDay to day general checking and assistance in maintenance of actuators , fsss, atrs, sg, tg, bop, foph, cw instrumentation and control system of unit n0.10 and 11, imd4 of 2x250 mw unit, stps, sarni.
Day to day general checking and assistance in maintenance of actuators , fsss, atrs, sg, tg, bop, foph, cw instrumentation and control system of unit n0.10 and 11, imd4 of 2x250 mw unit, stps, sarni.
Read moreProcurement of 300 nb and 250 nb cast basalt lined pipe line for installation in pressure conveying line of ash handling plant of unit no.10 and 11, stps sarni.
Procurement of 300 nb and 250 nb cast basalt lined pipe line for installation in pressure conveying line of ash handling plant of unit no. 10 and 11, stps sarni.
Read moreProcurement of industrial grey cpvc pipes confirming to standard astm-f-441 and cpvc fitting confirming to standard astm-f-439 for socket end for etp plant and tg-bop area of unit no. 10 and 11, ph-iv, stps, mppgcl, sarni.
Procurement of industrial grey cpvc pipes confirming to standard astm-f-441 and cpvc fitting confirming to standard astm-f-439 for socket end for etp plant and tg-bop area of unit no. 10 and 11, ph-iv, stps, mppgcl, sarni.
Read moreRate contract for the work of designing, providing, installation and commissioning of solar energy based bore well water pumping systems,including comprehensive operation and maintenance for a period of seven years in various villages/ towns of jaipu
Rate contract for the work of designing, providing, installation and commissioning of solar energy based bore well water pumping systems,including comprehensive operation and maintenance for a period of seven years in various villages/ towns of jaipu
Read moreSupply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony
Supply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony
Read moreArresting the leakages / seepages in the main plant buildings and underground structures of kaiga generating station 3 and 4
Arresting the leakages / seepages in the main plant buildings and underground structures of kaiga generating station 3 and 4, kaiga for the year 2025-27.
Read moreof your Industry type