Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Mp 2025 26 Renovation Works To The Field Channel Ing From Tail End Of Vallikode I Branch Canal Right Di From Ch0/350 Km To 0/550 Km At Varkkad Near To Nadakavu Temple General Civil Work
|
| Description |
The Provisions Included In This Estimate Are Side&Amp#X0d
Wall Demolishing, Earthwork Excavation, Cc&Amp#X0d
148using 40 Mm B/Stone For Bed Foundation,&Amp#X0d
Cc 136 Using 20 Mm Bstone For Side Walls,&Amp#X0d
Rcc 1 1 .5 3 For Cut And Cover Cc 1 2 4 Using&Amp#X0d
20 Mm Bstone
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2025_Irrig_783771_1 |
|
Reference Number |
IRR/PI/TR/3214/2025_5_1_1/1 |
| Tender Fee | 2150 |
| EMD | 24364 |
| Tender Value | - |
| Place | Vallikkode |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1297148 |
| Start Date | August 19, 2025 16:30 |
| End Date |
Expired
26/08/2025
Expired 380 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreGeneral-mp-2024-25-renovation of field channel -ing from sluice at ch5/400 of kavilpad branch canal at ch0/400 to 0/500 km and ch0/550 to ch0/700 km -general civil work
The provisions included in this&#x0d estimate are side wall demolishing, earthwork&#x0d excavation, cc 1 4 8 using 40 mm bstone for&#x0d bed foundation, cc 1 3 6 using 20 mm bstone&#x0d for side walls, cc1 24 using 20 mm bstone&#x0d for wearing coat,foot slab ,plast
Read moreGeneral-mp-2024-25- renovation of field channel-renovation of field channel ing from sluice ch 3/600 km of vallikode ii branch canal from ch0/050 km to ch 0/130 km -general civil work
Theside walls and foundation of the proposed&#x0d portion of the field channel is seen damaged&#x0d and the whole structure needs to be rectified for&#x0d the efficient conveyance of water and also to&#x0d reduce leakage
Read moreGeneral-mp-2024-25-renovation of field channel ing from sluice at ch5/029 km of mankara branch canal from ch0/500 km to ch0/775 km.-general civil work
The work has been included under the plan fund&#x0d for the modernisation of the field channels of the&#x0d malampuzha project.the proposed field channel&#x0d of mankara branch canal have been constructed&#x0d long years back. theside walls and foundation
Read moreGeneral-mp-2024-25-renovation of field channel ing from sluice at 1/800 km of mankurussi branch canal from ch0/000 km to ch0/275 km-general civil work
The provisions included in this estimate are&#x0d clearing jungle,demolishing concrete 1 3 6 for&#x0d old damaged wall,demolishing 1 4 8 for old&#x0d damaged canal bed,felling trees, earthwork&#x0d excavation, cc 14 8 using 40 mm b stone for&#x0d bed concrete,cc 136
Read moreGeneral- mp-2024-25-renovation of field channel-at tail end of vallikode i branch canal right di from ch 0/250 to 0/350 km and construction of culvert and bed slope correction inside muttikulangara police camp from ch0/500 km to ch0/570 km
Theside walls and foundation of the proposed&#x0d portion of the field channel is seen damaged and&#x0d the whole struc to be rectified for the&#x0d efficient conveyance of water and also to reduce&#x0d leakage. in aditional to this in the feild channel&#x0d inside
Read moreGeneral-mp-2025-26- renovation works to the field channel-ing from sluice ch1/650 km of vallikode i branch canal from ch0/600 km to 0/650 at mahali and tail end field channel at kulakkanampotta sarpakavu- general civil work
Muttikulangara padashekaram, the side walls&#x0d and foundation of the proposed portion of the&#x0d field channel is seen damaged and the whole&#x0d structure needs to be rectified for the efficient&#x0d conveyance of water and also to reduce leakage.&#x0d hence the p
Read moreGeneral-mp-2024-25-renovation of field channel ing from sluice at 1/800 km of mankurussi branch canal from ch0/000 km to ch 0/275 km.-general civil work
&#x0d clearing jungle,demolishing concrete 1 3 6 for&#x0d old damaged swall,demolishing 1 4 8 for old&#x0d damaged canal bed,felling trees, earthwork&#x0d excavation, cc 1 4 8 using 40 mm b/stone for&#x0d bed concrete,cc 1 3 6 using
Read moreGeneral-mp-2024-25-renovation of field channel ing from tail end field channel of thenur branch canal from ch 0/000 km to ch0/124 km-general civil work
The work has been included under the plan fund&#x0d for the renovation of the field channels of the&#x0d malampuzha project.the proposed field channel&#x0d of thenur branch canal have been constructed&#x0d long years back. theside walls and foundation of&#x0d the
Read moreGeneral-mp-2024-25-renovation of field channel ing from sluice at ch4/010 km of thenur branch canal at ch 0/000 km to ch0/020km.-general civil work
Malampuzha damis the second largest dam and&#x0d reservoirs in kerala,located near palakkad,built&#x0d post independence by the then madras state.&#x0d situated in the scenic hills of the western ghats&#x0d in the background it is a combination of a&#x0d masonry dam
Read moreof your Industry type