Tender Details

Particulars Details
Title
General Mp 2025 26 Renovation Works To The Field Channel Ing From Tail End Of Vallikode I Branch Canal Right Di From Ch0/350 Km To 0/550 Km At Varkkad Near To Nadakavu Temple General Civil Work
Description
The Provisions Included In This Estimate Are Side&Amp#X0d Wall Demolishing, Earthwork Excavation, Cc&Amp#X0d 148using 40 Mm B/Stone For Bed Foundation,&Amp#X0d Cc 136 Using 20 Mm Bstone For Side Walls,&Amp#X0d Rcc 1 1 .5 3 For Cut And Cover Cc 1 2 4 Using&Amp#X0d 20 Mm Bstone
Organisation Irrigation Department | State Govt. and UT
Tender Id 2025_Irrig_783771_1
Reference
Number
IRR/PI/TR/3214/2025_5_1_1/1
Tender Fee 2150
EMD 24364
Tender Value -
Place Vallikkode
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1297148

Start Date August 19, 2025 16:30
End Date
Expired 26/08/2025

Expired 380 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan

Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan

Read more
General-mp-2024-25-renovation of field channel -ing from sluice at ch5/400 of kavilpad branch canal at ch0/400 to 0/500 km and ch0/550 to ch0/700 km -general civil work

The provisions included in this&amp#x0d estimate are side wall demolishing, earthwork&amp#x0d excavation, cc 1 4 8 using 40 mm bstone for&amp#x0d bed foundation, cc 1 3 6 using 20 mm bstone&amp#x0d for side walls, cc1 24 using 20 mm bstone&amp#x0d for wearing coat,foot slab ,plast

Read more
General-mp-2024-25- renovation of field channel-renovation of field channel ing from sluice ch 3/600 km of vallikode ii branch canal from ch0/050 km to ch 0/130 km -general civil work

Theside walls and foundation of the proposed&amp#x0d portion of the field channel is seen damaged&amp#x0d and the whole structure needs to be rectified for&amp#x0d the efficient conveyance of water and also to&amp#x0d reduce leakage

Read more
General-mp-2024-25-renovation of field channel ing from sluice at ch5/029 km of mankara branch canal from ch0/500 km to ch0/775 km.-general civil work

The work has been included under the plan fund&amp#x0d for the modernisation of the field channels of the&amp#x0d malampuzha project.the proposed field channel&amp#x0d of mankara branch canal have been constructed&amp#x0d long years back. theside walls and foundation

Read more
General-mp-2024-25-renovation of field channel ing from sluice at 1/800 km of mankurussi branch canal from ch0/000 km to ch0/275 km-general civil work

The provisions included in this estimate are&amp#x0d clearing jungle,demolishing concrete 1 3 6 for&amp#x0d old damaged wall,demolishing 1 4 8 for old&amp#x0d damaged canal bed,felling trees, earthwork&amp#x0d excavation, cc 14 8 using 40 mm b stone for&amp#x0d bed concrete,cc 136

Read more
General- mp-2024-25-renovation of field channel-at tail end of vallikode i branch canal right di from ch 0/250 to 0/350 km and construction of culvert and bed slope correction inside muttikulangara police camp from ch0/500 km to ch0/570 km

Theside walls and foundation of the proposed&amp#x0d portion of the field channel is seen damaged and&amp#x0d the whole struc to be rectified for the&amp#x0d efficient conveyance of water and also to reduce&amp#x0d leakage. in aditional to this in the feild channel&amp#x0d inside

Read more
General-mp-2025-26- renovation works to the field channel-ing from sluice ch1/650 km of vallikode i branch canal from ch0/600 km to 0/650 at mahali and tail end field channel at kulakkanampotta sarpakavu- general civil work

Muttikulangara padashekaram, the side walls&amp#x0d and foundation of the proposed portion of the&amp#x0d field channel is seen damaged and the whole&amp#x0d structure needs to be rectified for the efficient&amp#x0d conveyance of water and also to reduce leakage.&amp#x0d hence the p

Read more
General-mp-2024-25-renovation of field channel ing from sluice at 1/800 km of mankurussi branch canal from ch0/000 km to ch 0/275 km.-general civil work

&amp#x0d clearing jungle,demolishing concrete 1 3 6 for&amp#x0d old damaged swall,demolishing 1 4 8 for old&amp#x0d damaged canal bed,felling trees, earthwork&amp#x0d excavation, cc 1 4 8 using 40 mm b/stone for&amp#x0d bed concrete,cc 1 3 6 using

Read more
General-mp-2024-25-renovation of field channel ing from tail end field channel of thenur branch canal from ch 0/000 km to ch0/124 km-general civil work

The work has been included under the plan fund&amp#x0d for the renovation of the field channels of the&amp#x0d malampuzha project.the proposed field channel&amp#x0d of thenur branch canal have been constructed&amp#x0d long years back. theside walls and foundation of&amp#x0d the

Read more
General-mp-2024-25-renovation of field channel ing from sluice at ch4/010 km of thenur branch canal at ch 0/000 km to ch0/020km.-general civil work

Malampuzha damis the second largest dam and&amp#x0d reservoirs in kerala,located near palakkad,built&amp#x0d post independence by the then madras state.&amp#x0d situated in the scenic hills of the western ghats&amp#x0d in the background it is a combination of a&amp#x0d masonry dam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise