Tender Details
Particulars | Details |
---|---|
Title |
General Emergency Work 2025 Kip O M Leak Arresting Work Of Cherukunnam Distributary Canal Between Ch 50m To 300 M General Civil Work
|
Description |
General Emergency Work 2025 Kip O M Leak Arresting Work Of Cherukunnam Distributary Canal Between Ch 50m To 300 M General Civil Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2025_Irrig_753672_3 |
Reference Number |
IRR/PII/TR/820/2025_5_1_1/1 |
Tender Fee | 555 |
EMD | 5398 |
Tender Value | |
Place | Cherukunnam |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1223357 |
Start Date | March 21, 2025 22:30 |
End Date |
29/03/2025 ( Expired 45 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Urgent protection to hill side slope between km.532/300 to km 535/600 on nh-66 in the state of goa under nh(o) annual plan 2024-25.
Urgent protection to hill side slope between km.532/300 to km 535/600 on nh-66 in the state of goa under nh(o) annual plan 2024-25.
Read moreDesign, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road
Design, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road
Read moreM/r to regulator gate and structure including canal banks in connection with khariff irrigation of 2024 under head quarter section of nalhati (i) sub division under m.n.c division during the period july 2025 to october 2025.
M/r to regulator gate and structure including canal banks in connection with khariff irrigation of 2024 under head quarter section of nalhati (i) sub division under m.n.c division during the period july 2025 to october 2025.
Read moreProviding and erecting safety crash barrier between ch.14.445 kms to ch.14.645 kms on n.i.p. side of sip main canal near sirvoi bridge in village sirvoi of quepem taluka.
Providing and erecting safety crash barrier between ch.14.445 kms to ch.14.645 kms on n.i.p. side of sip main canal near sirvoi bridge in village sirvoi of quepem taluka.
Read moreProviding and erecting safety crash barrier for distributory d1 canal between ch. 0 to 35m, 600m to 635m and 660m to 725m of s.i.p. in sirvoi village of quepem taluka.
Providing and erecting safety crash barrier for distributory d1 canal between ch. 0 to 35m, 600m to 635m and 660m to 725m of s.i.p. in sirvoi village of quepem taluka.
Read moreProviding and erecting safety crash barrier for distributory d1 canal between ch. 1400m to 1590m of s.i.p. near government college in xeldem village of quepem taluka.
Providing and erecting safety crash barrier for distributory d1 canal between ch. 1400m to 1590m of s.i.p. near government college in xeldem village of quepem taluka.
Read moreFor the work of repair of head regulator gate of seoni distributary canal r.d. 0.00 km to 13.50 km. of left bank canal of r.a.b.l.s project.
For the work of repair of head regulator gate of seoni distributary canal r.d. 0.00 km to 13.50 km. of left bank canal of r.a.b.l.s project.
Read moreDesign, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period
Read moreEe/o and m- iia / t- 05 of 2025-26
Repair and maintenance of grid distribution system of dankuni (part-a, monoharpur and mrigala g.p.) faws scheme from 12.03.2025 to 31.12.2025.
Read more35/2025-26 work for shifting of rising main, cluster and village distribution pipeline at dhanop kerot (km 18/700 to 46/300 up to mdr 154 and hlb on khari river enroute various villages of tehsil phuliya kalan under regular division shahpura dist bhl
Work for shifting of rising main, cluster and village distribution pipeline at dhanop kerot (km 18/700 to 46/300 up to mdr 154 and hlb on khari river enroute various villages of tehsil phuliya kalan under regular division shahpura distt. bhilwara.
Read moreof your Industry type