Tender Details
Particulars | Details |
---|---|
Title |
Material Handling Of Lubricants Barrels, Loading And Unloading And Other Cleaning Work Including Operator Cabin, Undercarriage Track Chain And Rollers Mud Of 05 Nos. Hydraulic Shovels And 02 Nos. Surface Miners Working In Khadia Project.
|
Description |
Material Handling Of Lubricants Barrels, Loading And Unloading And Other Cleaning Work Including Operator Cabin, Undercarriage Track Chain And Rollers Mud Of 05 Nos. Hydraulic Shovels And 02 Nos. Surface Miners Working In Khadia Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_328959_1 |
Reference Number |
KHD/G.M. (Excv)/E-Tender/24-25/919 |
Tender Fee | 0 |
EMD | 22300 |
Tender Value | |
Place | NCL KHADIA PROJECT, SHAKTINAGAR |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340970 |
Start Date | February 14, 2025 15:00 |
End Date |
25/02/2025 ( Expired 55 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Daily cleaning / washing of 03 nos. ekg 20cum shovels ,02 nos wk-20 tz shovels and01 no brs21 (under commissioning)per day including cleaning of operator cabin for the period of two year (730 days including sunday and holiday) at site, nigahi project
Daily cleaning / washing of 03 nos. ekg 20cum shovels ,02 nos wk-20 tz shovels and01 no brs21 (under commissioning)per day including cleaning of operator cabin for the period of two year (730 days including sunday and holiday) at site, nigahi project
Read moreModification of operator cabin air conditioning system of 02 nos. be1800e shovels from hydraulic powered to electrically powered by installing a motor of 415v/3ph/3hp after its rewinding and repair/rewinding of 06 nos. compressor motor 415v/15hp.
Modification of operator cabin air conditioning system of 02 nos. be1800e shovels from hydraulic powered to electrically powered by installing a motor of 415v/3ph/3hp after its rewinding and repair/rewinding of 06 nos. compressor motor 415v/15hp.
Read moreCleaning, loading, unloading and material handling works including cleaning of operator cabin of 02 nos. be-195b shovels (prakash and akash) of khadia project for a period of 313 days.
Cleaning, loading, unloading and material handling works including cleaning of operator cabin of 02 nos. be-195b shovels (prakash and akash) of khadia project for a period of 313 days.
Read moreFitment of safety glasses in operator cabin of 04 nos. er shovels (p and h-3,prakash,akash and wk 20 tz), 07 nos. hyd. shovels and surface miners (pc-1 and 2,tata-1 and 2,be-700 and surface miners 1 and 2) and 14 nos. drills of khadia project
Fitment of safety glasses in operator cabin of 04 nos. er shovels (p and h-3,prakash,akash and wk 20 tz), 07 nos. hyd. shovels and surface miners (pc-1 and 2,tata-1 and 2,be-700 and surface miners 1 and 2) and 14 nos. drills of khadia project
Read moreMaterial handling of lubricants barrels, loading and unloading and other cleaning work including operator cabin, undercarriage track chain and rollers mud of 05 nos. hydraulic shovels and 02 nos. surface miners working in khadia project.
Material handling of lubricants barrels, loading and unloading and other cleaning work including operator cabin, undercarriage track chain and rollers mud of 05 nos. hydraulic shovels and 02 nos. surface miners working in khadia project.
Read moreDaily cleaning / washing of 02 nos. pandh-1900al shovels (sl. no. 3 and 7) per day including cleaning of operator cabin for the period of one year (365 days including sunday and holiday) at site, nigahi project
Daily cleaning / washing of 02 nos. pandh-1900al shovels (sl. no. 3 and 7) per day including cleaning of operator cabin for the period of one year (365 days including sunday and holiday) at site, nigahi project
Read moreOrganizing / reorganizing of material, cleaning, loading and unloading and material handling works including cleaning of operator cabin of ekg 205 er shovel of khadia project for a period of 313 days.
Organizing / reorganizing of material, cleaning, loading and unloading and material handling works including cleaning of operator cabin of ekg 205 er shovel of khadia project for a period of 313 days.
Read moreProviding, cleaning and fixing of insulating rubber mat suitable for 6.6kv/ 3.3kv grade in operator cabin of 10 nos. dumpers, 02 nos. tankers, 03 nos. cranes and 05 nos. dozers for safety purpose at kathara colliery.
Providing, cleaning and fixing of insulating rubber mat suitable for 6.6kv/ 3.3kv grade in operator cabin of 10 nos. dumpers, 02 nos. tankers, 03 nos. cranes and 05 nos. dozers for safety purpose at kathara colliery.
Read moreOffloading work for cleaning of assembly and sub assembly of hemm, loading and unloading and material handling works for and from bws to field equipment at khadia project for a period of 365 days.
Offloading work for cleaning of assembly and sub assembly of hemm, loading and unloading and material handling works for and from bws to field equipment at khadia project for a period of 365 days.
Read moreRepairing of railing assy both sides, repairing and cleaning of radiator 02 nos hydraulic oil cooler, 01 nos transmission cooler, fabrication of new engine guard and transmission guard, glass fitment of operator cabin of bh100 d1278 of rohini ocp.
Repairing of railing assy both sides, repairing and cleaning of radiator 02 nos hydraulic oil cooler, 01 nos transmission cooler, fabrication of new engine guard and transmission guard, glass fitment of operator cabin of bh100 d1278 of rohini ocp.
Read moreof your Industry type