Tender Details

Particulars Details
Title
Fultali And Pandavpur G.P Sh Dismantling Old Pvc Pipes, Excavation For Old New Pipeline, Laying Of Upvc Pipe 2026 27(gr I) (Length 1420.00 Mtr.)
Description
Please Refer To Dn Ie T
Organisation Chief Engineer, PWD (DWS) | State Govt. and UT
Tender Id 2026_CEDWS_72354_1
Reference
Number
16/DNIeT/EE/DWS/AGT-II/2026-27
Tender Fee 1000
EMD 19407
Tender Value -
Place Agartala
Link
View Original Tender Notice

https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=73633

Start Date May 02, 2026 23:30
End Date
Expired 11/05/2026

Expired 161 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling/stripping of old corroded pipes, leakage testing and fitment of single/double ferrules in air brake pipe lines at dbws

Dismantling/stripping of old corroded pipes, leakage testing and fitment of single/double ferrules in air brake pipe lines at dbws

Read more
Ttps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area

Ttps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area

Read more
Repair and maint of the various types of pipeline including replacement of the old worn out pipes, valves fittting etc. along with the misc items of zone c and d under ge (west) pathankot

Repair and maint of the various types of pipeline including replacement of the old worn out pipes, valves fittting etc. along with the misc items of zone c and d under ge (west) pathankot

Read more
Deposit kumbalam grama panchayath project no 298 25 improving water supply by replacing old damaged pipelines in penaveedu road and bylane and ooramkodu lane by 63 mm 6kg cm2 pvc pipes using balance amount of 2049 2025 pipeline work

Deposit kumbalam grama panchayath project no 298 25 improving water supply by replacing old damaged pipelines in penaveedu road and bylane and ooramkodu lane by 63 mm 6kg cm2 pvc pipes using balance amount of 2049 2025 pipeline work

Read more
Supply and erection of ss304 pipes fittings and ms support structure hydro test detailded specification as per annexure attached,supply and erection of ductile iron pipe dia 150 mm,core cutting of 200 mm length and 50mm dia,welding for erection of ss304 pipes fittings and support structure with pad plates,dismantling cutting and disposal of existing pipeline fittings and supports

Supply and erection of ss304 pipes fittings and ms support structure hydro test detailded specification as per annexure attached,supply and erection of ductile iron pipe dia 150 mm,core cutting of 200 mm length and 50mm dia,welding for erection of ss304 pipes fittings and support structure with pad plates,dismantling cutting and disposal of existing pipeline fittings and supports

Read more
Manual excavation,excavation- hard rock,rcc breaking or dismantling,pcc m15 - sply and laying,rcc m25 - sply and laying,reinforcement steel,design, sply of chimney- height 8.0mtr,design, sply blower - 10000 cfm,design, sply flp motor suitable capacity,design and sply of suction hood,supply of damper,supply of manometer,design, sply of 20swg gi spiral duct,sply and fab structrual steel supports,erection and commng of ves,dismant and removal of 20 swg old ducts

Manual excavation,excavation- hard rock,rcc breaking or dismantling,pcc m15 - sply and laying,rcc m25 - sply and laying,reinforcement steel,design, sply of chimney- height 8.0mtr,design, sply blower - 10000 cfm,design, sply flp motor suitable capacity,design and sply of suction hood,supply of damper,supply of manometer,design, sply of 20swg gi spiral duct,sply and fab structrual steel supports,erection and commng of ves,dismant and removal of 20 swg old ducts

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Dismantling, cutting and repairing of old worn out/eroded pipeline and erection of eco ash pan pipeline

Dismantling, cutting and repairing of old worn out/eroded pipeline and erection of new 200/100/50/25 mm nb eco ash pan pipeline in unit 5 and 6, 2x250mw, ctps, ptpp, parichha, jhansi

Read more
School of indian legal thought repairing works of pipeline by removing old damaged g i pipes with new pvc pipes.

School of indian legal thought repairing works of pipeline by removing old damaged g i pipes with new pvc pipes.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise