Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Increasing Capacity Of Transformer In Business Plan Under Edd V, Bulandshahr.
|
| Description |
Increasing Capacity Of Transformer In Business Plan Under Edd V, Bulandshahr.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNL_794971_1 |
|
Reference Number |
01/EDC-II/BSR/2023-24 |
| Tender Fee | 1180 |
| EMD | 1500 |
| Tender Value | - |
| Place | EDC 2 BULANDSHAHR |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | April 06, 2023 23:30 |
| End Date |
Expired
03/07/2023
Expired 1177 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Package v laying of cc roads, construction of cc drains in ward no. 26,27,28,29,30,31,32,33,34,46 and 47 of adilabad municipality under tufidc
Package v laying of cc roads, construction of cc drains in ward no. 26,27,28,29,30,31,32,33,34,46 and 47 of adilabad municipality under tufidc
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreImprovement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreProviding of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Providing of external electrification with under ground cable system to the approved hmda layout in sy.no.239, 240, 247,249 of bahadurpally(v), dundigal gandimaisamma(m), medchal-malkajgiri(dist).
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreIncreasing capacity of transformer and other work in business plan under edd-v, bulandshahr.
Increasing capacity of transformer and other work in business plan under edd-v, bulandshahr.&#x0d
Read moreIncreasing capacity of transformer and other work in business plan under edd-i, bulandshahr.
Increasing capacity of transformer and other work in business plan under edd-i, bulandshahr.
Read moreFixing of telless unit on distribution transformer in business plan under edd-v, bulandshahr.
Fixing of telless unit on distribution transformer in business plan under edd-v, bulandshahr.
Read moreIncreasing capacity of transformer and other work in business plan under edd-iv, syana.
Increasing capacity of transformer and other work in business plan under edd-iv, syana.&#x0d
Read moreIncreasing of 5 nos. low capacity transformer to high capacity transformer under business plan in edd padrauna, kushinagar
Increasing of 5 nos. low capacity transformer to high capacity transformer under business plan in edd padrauna, kushinagar
Read moreof your Industry type