Tender Details
Particulars | Details |
---|---|
Title |
Rfp For Construction Of (A) Additional Mnb With Approaches, Rcc Drain At Km 28.842 Of Nh 361 (Design Chainage Km 0.426) In Ujani (B) 3 Nos. Of Box Culverts In Ashiv, Rcc Drain In Tuljapur Bypass Of Tuljapur Ausa Section Of Nh 361 In The State Of Mh
|
Description |
Rfp For Construction Of (A) Additional Mnb With Approaches, Rcc Drain At Km 28.842 Of Nh 361 (Design Chainage Km 0.426) In Ujani (B) 3 Nos. Of Box Culverts In Ashiv, Rcc Drain In Tuljapur Bypass Of Tuljapur Ausa Section Of Nh 361 In The State Of Mh
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_211124_1 |
Reference Number |
NHAI/RO-NAG/TENDERS/2024-25/19 |
Tender Fee | 10000 |
EMD | 17.38 Lakh |
Tender Value | |
Place | NHAI RO Nagpur |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=231484 |
Start Date | October 11, 2024 19:35 |
End Date |
26/03/2025 ( Expired 26 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreConstruction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Read moreRfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreUpgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Read moreConstruction of widening of existing 4-lane highway 7.5m(average) width to 10m width from 0.000 (design chainage) to km 4.200 (design chainage) on kanpur to kabrai section of nh-86 in the state of uttar pradesh
Construction of widening of existing 4-lane highway 7.5m(average) width to 10m width from 0.000 (design chainage) to km 4.200 (design chainage) on kanpur to kabrai section of nh-86 in the state of uttar pradesh
Read more4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
Read moreConstruction of balance new service road mnb culverts drain vup-lvup-svup and its work km 656.000-km725.185 of rewa katni jabalpur section (p-1) and from km 725.185-km774.068 and km793.065-km813.257 (p-2) of nh-30 in the state of mp on epc mode
Construction of balance new service road mnb culverts drain vup-lvup-svup and its work km 656.000-km725.185 of rewa katni jabalpur section (p-1) and from km 725.185-km774.068 and km793.065-km813.257 (p-2) of nh-30 in the state of mp on epc mode
Read moreof your Industry type