Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Birur Shunting Neck Of 750m Towards Dru End By Extending The Existing Siding On Road 4 At Birur Station.
Sw I: Earth Work For Formation
Sw Ii : Track Linking Works
Sw Iii Side Drain 750m
Sw Iv : Construction Of Retaining Wall 700m
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83874319 |
|
Reference Number |
24MYS25of28-08-25itemno5 |
| Tender Fee | 0 |
| EMD | 4.8 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83874319/viewNitPdf_5087534.pdf |
| Start Date | August 29, 2025 00:05 |
| End Date |
Expired
22/09/2025
Expired 345 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Halvad - provision of full length shunting neck by extending the dead end of line no. 4 by 950m towards gandhidham end & other associated work under jurisdiction senior divisional engineer (west) - ahmedabad.
For complete deion and other details, please refer to tender
Read moreProposed doubling of track between vanchi maniyachchi and nagercoil - earthwork in formation and other connected works for stabling lines, shunting neck, etc., at nagercoil yard in trivandrum division of southern railway.
For complete deion and other details, please refer to tender
Read moreP.way linking of bg track and other allied works such as making connections with old existing track laying of turnouts, glued joints, putting of ballast, leading, loading, unloading of p. way material, ballast supply, at welding work etc. in connection with provision of shunting neck at pathankot cantt (ptkc) railway station to facilitate shunting movement avoiding involvement of main line
For complete deion and other details, please refer to tender
Read moreSw-i:- upgradation of sultanabad yard - earth work in formation, extension of existing bridges, laying and linking of bg track, assembling and ion of points and crossings, supplying, leading and dumping of stone ballast, construction of station building, construction of platform and other miscellaneous works for proposed upgradation of sultanabad yard in pdpl-nzb section. sw-ii:- provision of new crossing station poduru - earth work in formation, extension of existing bridge, laying and
For complete deion and other details, please refer to tender
Read moreSasalu: extension of rd-4 electronic in motion weigh bridge line by 750 mtrs at slu yard sw-i: ancillary works in connection with extension and linking of track along with earthwork in embankment towards ubl end. sw-ii: provision of retaining wall of 3m height and 100m length for retaining earth in embankment . sw iii: provision of toe wall of 1 m height and 200 m length to pr formation of main line. sw-iv: extension of bridge no 51 by rcc box of size 3.0x6.6 m at km. 289/900-290/000 in
For complete deion and other details, please refer to tender
Read moreSw-i-vijayawada division - mcs- improvement of memu coach maintenance facilites and development of infrastructure facilities at mcs/rjy - additions and alterations to ohe in connection with connecting the ll bay to shunting neck (second entry) - 450 mtrs. . sw-ii-vijayawada division - mcs- improvement of memu coach maintenance facilites and development of infrastructure facilities at mcs/rjy - additions and alterations to ohe in connection with extension of old sunken pit
For complete deion and other details, please refer to tender
Read moreGuntakal division: sw-i : ohe modification works in connection with the development works at muddanuru (moo) goods shed. sw-ii: ohe modification works in connection with the proposed timmanacherla shunting neck to down common loop line gtl-gy section. sw-iii :ohe modification works in connection with proposed construction of road under bridge (subway) in lieu of lc no.83 at km 171/3-5 between sf-kou stations, lc no.93 at km 189/9-11 in obvp yard, lc no.94 at km 191/7-9 between obvp-pmt station
For complete deion and other details, please refer to tender
Read moreElectrical work in connection with provision of full length shunting neck by extending the dead end of line no. 4 by 950m towards gandhidham end at halvad, provision of offside goomtie at 30 stations for group d staff for exchange of all right signal with running through train and elimination of level crossings - 52, 101, 102, 104 & 110 by providing rubs with covered approaches in palanpur-samakhiyali section.
For complete deion and other details, please refer to tender
Read moreof your Industry type