Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hubballi Division: Sw I: Proposed Construction Of High Level Platform At Parankanahatti Halt Station(proposed Length 560 M X Width 6.0 Mtrs) Sw Ii: Proposed Construction Of Track Machine Rest House In Khanapur, Desur, Sulebhavi And Pachchapur. Sw Iii: Provision Of Low Cost Platform Shelters At Parakanahatti.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79575039 |
|
Reference Number |
39UBL24-25DT270125ITEM-03 |
| Tender Fee | 0 |
| EMD | 4.51 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79575039/viewNitPdf_4835395.pdf |
| Start Date | January 29, 2025 23:39 |
| End Date |
Expired
25/02/2025
Expired 598 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance contract for electronic interlocking system of m/s siemens rail automation pvt. ltd. ( mark -ii) make installed at hombal, balganur, malapur, hole alur, gadag bypass khanapur, suldhal, sulebhavi, sambre, desur, gunji, pachchpur, gokak road, lakhmapur, badami, sulikeri and bagalkot stations ( total - 17 stations) over hubli division for a period of four years.
Annual maintenance contract for electronic interlocking system of m/s siemens rail automation pvt. ltd. ( mark -ii) make installed at hombal, balganur, malapur, hole alur, gadag bypass khanapur, suldhal, sulebhavi, sambre, desur, gunji, pachchpur, gokak road, lakhmapur, badami, sulikeri and bagalkot stations ( total - 17 stations) over hubli division for a period of four years.
Read moreElectrical arrangements - sw-i : proposed construction of high level platform at parakanahatti halt station (proposed length 560 m x width 6.0 mtr). sw-ii: construction of track machine rest house in desur (dur) & sulebhavi stations. sw-iii: construction of track machine rest house in khanapur (knp) & pachchapur (pch) stations under hubli division.
For complete deion and other details, please refer to tender
Read moreHubballi division: proposed construction of over head tank (oht) with ground level reservoir (glr) at khanapur(knp). (maintenance period=03 years)
For complete deion and other details, please refer to tender
Read moreHubballi division: sw-i: proposed construction of cc road (approach road) to goodshed at gokak road. sw-ii: construction of divyangjan facilities like toilet, waterbooth, ramp, trolley, path etc., kudachi, chnichill, raybag, chikkodi, bagewadi halt and ghataprabha stations. (maintenance period= 12 months)
For complete deion and other details, please refer to tender
Read moreProvision of passenger amenities at proposed ridhhapur halt station viz platform, small shed and drinking water facilities.
For complete deion and other details, please refer to tender
Read moreOhe modification for provision/extension high level platform at savanur, bhanapur, hitnal halt, annigeri, ibrahimpur, hombal, lakhmapur, ginigera, bannikoppa railway stations in hubballi division.
For complete deion and other details, please refer to tender
Read moreOhe modification for provision/extension high level platform at savanur, bhanapur, hitnal halt, annigeri, ibrahimpur, hombal, lakhmapur, ginigera, bannikoppa railway stations in hubballi division.
For complete deion and other details, please refer to tender
Read moreAnnual maintenance contract for electronic interlocking system of m/s siemens rail automation pvt. ltd. ( mark -ii) make installed at khanapur, suldhal, sulebhavi, sambre, desur, gunji, pachchpur, gokak road, lakhmapur and badami stations ( total - 10 stations) over hubli division for a period of two years.
For complete deion and other details, please refer to tender
Read moreBengaluru - yeliyur section: proposed foot over bridge (fob) at nidaghatta (nzh) halt station connecting platform no. 1 and platform no.2. maintenance period is 3months.
For complete deion and other details, please refer to tender
Read moreBengaluru - yeliyur section: proposed foot over bridge (fob) at kettohalli (khll) halt station connecting platform no-1 and platform no-2. maintenance period is 6months.
For complete deion and other details, please refer to tender
Read moreof your Industry type