Tender Details

Particulars Details
Title
Ttps Es Em Ii Annual Service Maintenance Contract For 2 Nos Freight Cum Passengers Lift In Unit I Ii And Iii Boiler Area Period From 01042024 To 31032025
Description
Ttps Es Em Ii Annual Service Maintenance Contract For 2 Nos Freight Cum Passengers Lift In Unit I Ii And Iii Boiler Area Period From 01042024 To 31032025
Organisation Government of Tamil Nadu
Tender Id 2024_EB_407313_1
Reference
Number
CE/SE/ES /TTPS /No. 46/2024-25
Tender Fee 0
EMD 2700
Tender Value
Place O/o SE/ES/TTPS
Link https://tntenders.gov.in
Start Date January 08, 2024 19:30
End Date

23/01/2024 ( Expired 527 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tender for annual maintenance contract for electrical installations and water pumpsets at (i) nabard tower, usmanpura, and at (ii) nabard vihar, navrangpura, ahmedabad for the period 01 october 2025 to 30 september 2027

Tender for annual maintenance contract for electrical installations and water pumpsets at (i) nabard tower, usmanpura, and at (ii) nabard vihar, navrangpura, ahmedabad&#x0d for the period 01 october 2025 to 30 september 2027

Read more
Ttps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area

Ttps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area

Read more
Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v

Ttps es circle em iii replacement of worm out gi earth flat by new earth flat size 50 x 10 mm and reconnecting of earth fit of ahp ii foph ii and wtp ii in unit iv and v

Read more
Ttps es circle em iii unit v replacing the coal mill motor 5e sl no 188040 by a spare coal mill motor sl no 32260 a401 04 10 in unit 5 boiler area and overhauling released the coal mill motor sl no 188040

Ttps es circle em iii unit v replacing the coal mill motor 5e sl no 188040 by a spare coal mill motor sl no 32260 a401 04 10 in unit 5 boiler area and overhauling released the coal mill motor sl no 188040

Read more
Ttps es circle em iii external painting of lt switchgear modules and breaker panels writing the module service names and breaker panel service names by painting the background in unit v

Ttps es circle em iii external painting of lt switchgear modules and breaker panels writing the module service names and breaker panel service names by painting the background in unit v

Read more
Hiring of 2(two) nos of not less than 400tph capacity mobile/semi-mobile crushers for crushing of 60lt pf coal to (-)100 mm size (in all dimensions) including provision, installation of new crushing unit with all infrastructure with feeding , crushing and unloading the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at pkoc(sec-iv),mng area.

Hiring of 2 (two) nos of not less than 400 tph capacity mobile/semi-mobile crushers for crushing of 60 lt of coal to (-) 100 mm size (in all dimensions) including provision, installation of new crushing unit with all infrastructure with feeding, crushing and unloading the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at pkoc (sec-iv), mng area.

Read more
Mtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and

Mtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and

Read more
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Read more
Sp.137 nctps ii es circle em ii dn boiler aux mtce sdni cleaning of cooler and heat barrier in bcw pump cum motors 2a 2b and 2c at 24 mtr boiler elevation during the aoh period 2025 of unit ii

Sp.137 nctps ii es circle em ii dn boiler aux mtce sdni cleaning of cooler and heat barrier in bcw pump cum motors 2a 2b and 2c at 24 mtr boiler elevation during the aoh period 2025 of unit ii

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise