Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Lohamandi Zone Under Sbi Bank Under Construction Work Of Side Track By Interlocking On Both Sides Of The Road Till Bank Chauraha Rajamandi Railway Station Road.
|
| Description |
Lohamandi Zone Under Sbi Bank Under Construction Work Of Side Track By Interlocking On Both Sides Of The Road Till Bank Chauraha Rajamandi Railway Station Road.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_DOLBU_818601_1 |
|
Reference Number |
07-07-2023/NAGAR NIGAM/12-07-2023/87 |
| Tender Fee | 4000 |
| EMD | 4.1 Lakh |
| Tender Value | - |
| Place | NAGAR NIGAM |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | July 07, 2023 21:30 |
| End Date |
Expired
13/07/2023
Expired 1190 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Interlocking tiles work on both sides of the side track from aashirwad hotel to sushila school cut in gandhinagar under city zone.
Interlocking tiles work on both sides of the side track from aashirwad hotel to sushila school cut in gandhinagar under city zone.
Read moreWork of interlocking tiles on the side tracks on both sides from gt road toilet to bajariya cut on railway road under city zone.
Work of interlocking tiles on the side tracks on both sides from gt road toilet to bajariya cut on railway road under city zone.
Read moreIn ward no. 15 abdul kalam nagar, construction work of cc road and drain cover on both sides from haji siraj shop to before up baroda bank.
In ward no. 15 abdul kalam nagar, construction work of cc road and drain cover on both sides from haji sirajshop to before up baroda bank.
Read moreConstruction of precast rcc drains on both sides of the road in ward-56, spanning from pillokhadi pul to lisadi gate crossing and from bhumiya pul to p.n. bank.
Construction of precast rcc drains on both sides of the road in ward-56, spanning from pillokhadi pul to lisadi gate crossing and from bhumiya pul to p.n. bank.
Read moreConstruction of interlocking tiles and drain on both sides of the side track of the road from rdc flyover (khurana mortus) to pwd quarters in city zone ward-08, maliwada.
Construction of interlocking tiles and drain on both sides of the side track of the road from rdc flyover (khurana mortus) to pwd quarters in city zone ward-08, maliwada.
Read moreIn ward-14, sec-09 e-block, work of laying drains and interlocking tiles on both sides of the road from railway road to b block jkg public school.
In ward-14, sec-09 e-block, work of laying drains and interlocking tiles on both sides of the road from railway road to b block jkg public school.
Read moreInterlocking tiles and drain repair work on both sides of the side track of the road from c/116 to c/84 in city zone ward-08, nehru nagar ii c block.
Interlocking tiles and drain repair work on both sides of the side track of the road from c/116 to c/84 in city zone ward-08, nehru nagar ii c block.
Read moreInterlocking tiles and drain repair work on both sides of the side track of the road from urvashi saree centre to siddharth homes via c/70 in city zone ward-08, nehru nagar ii c block.
Interlocking tiles and drain repair work on both sides of the side track of the road from urvashi saree centre to siddharth homes via c/70 in city zone ward-08, nehru nagar ii c block.
Read moreState plan 2026 2027 optimisation of production and transmission replacing old 150 mm ac pipeline with 110 mm pvc pipeline on both sides of thondra vallamkulam road from kuttoor junction to railway cross under nedumpuram section general civil work
State plan 2026 2027 optimisation of production and transmission replacing old 150 mm ac pipeline with 110 mm pvc pipeline on both sides of thondra vallamkulam road from kuttoor junction to railway cross under nedumpuram section general civil work
Read moreIn ward-96, nehru nagar-second b-block, road improvement work by dans from b-5 to b-10a and from b-66 to b-172 and interlocking tiles work on the drain and side track on both sides from nehru nagar-b-66 to b-172 and interlocking tiles work on the sid
In ward-96, nehru nagar-second b-block, road improvement work by dans from b-5 to b-10a and from b-66 to b-172 and interlocking tiles work on the drain and side track on both sides from nehru nagar-b-66 to b-172 and interlocking tiles work on the sid
Read moreof your Industry type