Tender Details
About Tender
🏭 Ntpc Limited Procurement Notice 🏭 Ntpc Limited, A Leading Public Sector Undertaking, Is Seeking Bids For The Procurement Of Rotameter For Fans Lubricating Oil/Control Oil Cooling Water Circuit For Ntpc Tandar Stage Ii. 📍 Location: Simhadri Super Thermal Power Plant, Simhadri, Visakhapatnam 🗓️ Bid Submission Deadline: May 10, 2024, 4:00 Pm The Procurement Is Part Of The Ongoing Development And Maintenance Of The Power Plant's Infrastructure. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Pricing, And Compliance With Safety And Quality Standards, By The Specified Deadline. Keywords: Ntpc Limited, Rotameter, Fans Lubricating Oil, Control Oil, Cooling Water Circuit, Power Plant, Infrastructure, Procurement, Government TenderParticulars | Details |
---|---|
Title |
Procurement Of Rotameter For Fans Lube Oil / Control Oil Cooling Water
|
Description |
Procurement Of Rotameter For Fans Lube Oil / Control Oil Cooling Watercircuit For Ntpc Tanda Stage Ii
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id | 2024_NTPC_86290_1 |
Reference Number |
NTPC/USSC-CPG3/9900279403 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Simhadri Super Thermal Power P.O. SIMHADRI VISAKHA |
Link | https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=89482 |
Start Date | April 24, 2024 19:30 |
End Date |
10/05/2024 ( Expired 393 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of oil cooler for ash slurry pump for ahd gadarwara
Procurement of oil cooler for ash slurry pump for ahd gadarwara
Read moreSupply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Read moreComprehensive annual maintenance contract of carrier and york make water cooled chiller of airport express line for five years.
Comprehensive annual maintenance contract of carrier and york make water cooled chiller of airport express line for five years.
Read moreJp/b862-204-pd-t-8701/1016 - water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreInviting rates for supply of water purification material for the financial year 2025-26
Inviting rates for supply of water purification material for the financial year 2025-26
Read more81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
Read moreBalance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Read morePrequalification of consultant for preparation of detailed project report (dpr) and/ or for project management consultant (pmc) for water supply systems in towns of beyla, koubia, and fria in guinea
Prequalification of consultants for drinking water supply systems in towns of beyla, koubia, and fria project in guinea involving water intake, storage, treatment, pumping and onwards distribution to households
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreProcurement of liquid chlorine for water treatment plant, emcd-xvi, 2x660 mw, jtpp malawan, etah
Procurement of liquid chlorine for water treatment plant, emcd-xvi, 2x660 mw, jtpp malawan, etah
Read moreof your Industry type