Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design And Construction Of 1x20 Mtr Intermediate Lane Composite Girder Bridge At Aragam Bandipora On Epc Mode
|
| Description |
Design And Construction Of 1x20 Mtr Intermediate Lane Composite Girder Bridge At Aragam Bandipora On Epc Mode
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_PWDJK_239153_1 |
|
Reference Number |
e-NIT No.99 of 2023-24 Dated.05-12-2023 |
| Tender Fee | 5500 |
| EMD | 5.05 Lakh |
| Tender Value | 0 |
| Place | Office of Superintending Engineer PWD RandB Circle |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | December 06, 2023 15:30 |
| End Date |
Expired
18/12/2023
Expired 1031 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 30.00m steel composite girder bridge at km 31.600 design chainage 243.46 on gangotri rishikesh section of nh34 on epc mode in the state of uttarakhand under epc mode
Construction of 30.00m steel composite girder bridge at km 31.600 design chainage 243.46 on gangotri rishikesh section of nh34 on epc mode in the state of uttarakhand under epc mode
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreUpgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Read moreConstruction of a two-lane secondary service road along uer-ii within the available row in the state of delhi on epc mode.
Construction of a two-lane secondary service road along uer-ii within the available row in the state of delhi on epc mode.
Read moreUpgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Read moreConstruction of 2 lane bridge at km 21.206 and km 26.983 at bargarh district on nh-26 in the state of odisha under epc mode
Construction of 2 lane bridge at km 21.206 and km 26.983 at bargarh district on nh-26 in the state of odisha under epc mode
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreBalance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
Balance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
Read moreof your Industry type