Tender Details

Particulars Details
Title
Design And Construction Using Thin White Topping (Twt) Including Routine Maintenance And Balance Works Of Khed Sinnar Section From Km.42.000 To Km.177.000 On Nh 60 In The State Of Maharashtra As Standalone Project On Epc Mode.
Description
Design And Construction Using Thin White Topping (Twt) Including Routine Maintenance And Balance Works Of Khed Sinnar Section From Km.42.000 To Km.177.000 On Nh 60 In The State Of Maharashtra As Standalone Project On Epc Mode.
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_188567_1
Reference
Number
NHAI/Tech/MH /Khed-Sinnar/EPC/TWT/2024
Tender Fee 50000
EMD 4.31 Crore
Tender Value
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=206386

Start Date February 28, 2024 14:30
End Date
Expired 13/03/2024

Expired 830 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Design and const using thin white topping including routine maintenance n balance works of khed sinnar sec km.42.000 to km.177.000 in the state of maharashtra as standalone project on epc mode.

Design and const using thin white topping including routine maintenance n balance works of khed sinnar sec km.42.000 to km.177.000 in the state of maharashtra as standalone project on epc mode.

Read more
Improvement and strengthening of existing 2 lane stretch to 2 lane paved shoulder (1.5 m bhs) on ghoti-sinnar section of nh-160a from km.0.000 to km.53.500 using thin white topping (200 mm thick) the state of maharashtra on epc mode

Improvement and strengthening of existing 2 lane stretch to 2 lane paved shoulder (1.5 m bhs) on ghoti-sinnar section of nh-160a from km.0.000 to km.53.500 using thin white topping (200 mm thick) the state of maharashtra on epc mode

Read more
Periodic renewal of six laned pimpalgaon nashik gonde section of nh 03 using thin white topping twt

Periodic renewal of six laned pimpalgaon nashik gonde section of nh 03 using thin white topping twt

Read more
Balance works of 4 sinnar to shirdi section of nh 160 from design ch 0 000 to 50 943 in the state of maharashtra on epc mode

Balance works of 4 sinnar to shirdi section of nh 160 from design ch 0 000 to 50 943 in the state of maharashtra on epc mode

Read more
Design and construction of i vup at km 47 150 khed bypass end junction ii vup at saykhindi phata at km 153 880 and iii vup at nandurshingote bp end junction at km 165 430 on khed sinnar section of nh 60 in the state of maharashtra on epc mode

Design and construction of i vup at km 47 150 khed bypass end junction ii vup at saykhindi phata at km 153 880 and iii vup at nandurshingote bp end junction at km 165 430 on khed sinnar section of nh 60 in the state of maharashtra on epc mode

Read more
Design and construction of 6 lane standalone single span grade separated structure at km 532 552 on gonde vadape section of nh 3 new nh 848 in the state of maharashtra balance work on epc mode

Design and construction of 6 lane standalone single span grade separated structure at km 532 552 on gonde vadape section of nh 3 new nh 848 in the state of maharashtra balance work on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise