Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design And Construction Using Thin White Topping (Twt) Including Routine Maintenance And Balance Works Of Khed Sinnar Section From Km.42.000 To Km.177.000 On Nh 60 In The State Of Maharashtra As Standalone Project On Epc Mode.
|
| Description |
Design And Construction Using Thin White Topping (Twt) Including Routine Maintenance And Balance Works Of Khed Sinnar Section From Km.42.000 To Km.177.000 On Nh 60 In The State Of Maharashtra As Standalone Project On Epc Mode.
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_188567_1 |
|
Reference Number |
NHAI/Tech/MH /Khed-Sinnar/EPC/TWT/2024 |
| Tender Fee | 50000 |
| EMD | 4.31 Crore |
| Tender Value | |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=206386 |
| Start Date | February 28, 2024 14:30 |
| End Date |
Expired
13/03/2024
Expired 830 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreDesign and const using thin white topping including routine maintenance n balance works of khed sinnar sec km.42.000 to km.177.000 in the state of maharashtra as standalone project on epc mode.
Design and const using thin white topping including routine maintenance n balance works of khed sinnar sec km.42.000 to km.177.000 in the state of maharashtra as standalone project on epc mode.
Read moreImprovement and strengthening of existing 2 lane stretch to 2 lane paved shoulder (1.5 m bhs) on ghoti-sinnar section of nh-160a from km.0.000 to km.53.500 using thin white topping (200 mm thick) the state of maharashtra on epc mode
Improvement and strengthening of existing 2 lane stretch to 2 lane paved shoulder (1.5 m bhs) on ghoti-sinnar section of nh-160a from km.0.000 to km.53.500 using thin white topping (200 mm thick) the state of maharashtra on epc mode
Read morePeriodic renewal of six laned pimpalgaon nashik gonde section of nh 03 using thin white topping twt
Periodic renewal of six laned pimpalgaon nashik gonde section of nh 03 using thin white topping twt
Read moreBalance works of 4 sinnar to shirdi section of nh 160 from design ch 0 000 to 50 943 in the state of maharashtra on epc mode
Balance works of 4 sinnar to shirdi section of nh 160 from design ch 0 000 to 50 943 in the state of maharashtra on epc mode
Read moreDesign and construction of i vup at km 47 150 khed bypass end junction ii vup at saykhindi phata at km 153 880 and iii vup at nandurshingote bp end junction at km 165 430 on khed sinnar section of nh 60 in the state of maharashtra on epc mode
Design and construction of i vup at km 47 150 khed bypass end junction ii vup at saykhindi phata at km 153 880 and iii vup at nandurshingote bp end junction at km 165 430 on khed sinnar section of nh 60 in the state of maharashtra on epc mode
Read moreDesign and construction of 6 lane standalone single span grade separated structure at km 532 552 on gonde vadape section of nh 3 new nh 848 in the state of maharashtra balance work on epc mode
Design and construction of 6 lane standalone single span grade separated structure at km 532 552 on gonde vadape section of nh 3 new nh 848 in the state of maharashtra balance work on epc mode
Read moreof your Industry type