Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mw (Sr) To Conservation Of Excavated Site And Construction Of Inner Moat Wall At Bekal Fort, Pallikkare Under Comprehensive Conservation Work, Archaeological Survey Of India, Thrissur Circle (Re Tender 3rd Call).
|
| Description |
Mw (Sr) To Conservation Of Excavated Site And Construction Of Inner Moat Wall At Bekal Fort, Pallikkare Under Comprehensive Conservation Work, Archaeological Survey Of India, Thrissur Circle (Re Tender 3rd Call).
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_ASI_757509_1 |
|
Reference Number |
05/TCR-KL/2023-24 |
| Tender Fee | 0 |
| EMD | 85000 |
| Tender Value | - |
| Place | Office of the Superintending Archaeologist |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | June 14, 2023 00:00 |
| End Date |
Expired
03/07/2023
Expired 1199 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Execution of work under mw (upha) to grill fencing on northern side (remaining) inside the citadel walls (fort), champaner- pavagadh
Towards earth work in excavation by manual means in foundation trenches or drains, supplying and filling in plinth with sand under floors, brick work, hiring charges of hydraulic machine, stone work, steel work welded, etc. as mentioned in boq.
Read moreExecution of work under mw (conservation) to repairs disturb stone flooring at sion fort, sion, mumbai. as specified in the boq.
Execution of work under mw (conservation) to repairs disturb stone flooring at sion fort, sion, mumbai. as specified in the boq.
Read moreExecution of work under mw (cons) to repairs and reconstruction of fortification wall western side at kolaba fort. as specified in the boq.
Execution of work under mw (cons) to repairs and reconstruction of fortification wall western side at kolaba fort. as specified in the boq.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreMw (sr) to conservation of excavated site and construction of inner moat wall at bekal fort, pallikkare under comprehensive conservation work, archaeological survey of india, thrissur circle (re-tender-4th call)
Mw (sr) to conservation of excavated site and construction of inner moat wall at bekal fort, pallikkare under comprehensive conservation work, archaeological survey of india, thrissur circle (re-tender-4th call)
Read moreMw (sr) to providing essential tourist amenities at 75 identified monuments for revamping of bekal fort, pallikkare, kerala under asi, thrissur circle
Mw (sr) to providing essential tourist amenities at 75 identified monuments for revamping of bekal fort, pallikkare, kerala under asi, thrissur circle
Read moreProviding manpower supply (unskilled/skilled labour) for mw (sr) to restoration of fortification wall and providing approach pathway at bekal fort, pallikkare under comprehensive conservation work under archaeological survey of india, thrissur circle
Providing manpower supply (unskilled/skilled labour) for mw (sr) to restoration of fortification wall and providing approach pathway at bekal fort, pallikkare under comprehensive conservation work under archaeological survey of india, thrissur circle
Read moreProviding manpower supply (unskilled/skilled labour) for mw (sr) to restoration of fortification wall and providing approach pathway at bekal fort, pallikkare under comprehensive conservation work under archaeological survey of india, thrissur circle
Providing manpower supply (unskilled/skilled labour) for mw (sr) to restoration of fortification wall and providing approach pathway at bekal fort, pallikkare under comprehensive conservation work under archaeological survey of india, thrissur circle
Read moreof your Industry type