Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Workof Kandai Khera To Barswar Motor Road, Length 12.300 Km. With Maintenance Yearwise Ii Ird, I Vth And Vth Year Under Pmgsy
|
| Description |
Balance Workof Kandai Khera To Barswar Motor Road, Length 12.300 Km. With Maintenance Yearwise Ii Ird, I Vth And Vth Year Under Pmgsy.
|
| Organisation | Government of Uttarkhand |
| Tender Id | 2023_URRDA_66719_1 |
|
Reference Number |
561/1MG Dated 19-12-2023 |
| Tender Fee | 4720 |
| EMD | 57200 |
| Tender Value | |
| Place | EE PMGSY PWD Satpuli (H.Q.- Kotdwara) |
| Link |
View Original Tender Notice
https://uktenders.gov.in |
| Start Date | December 21, 2023 21:30 |
| End Date |
Expired
05/01/2024
Expired 891 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)
Construction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)
Read moreUnder the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Under the renewal item year 2026-27 renewal work by sdbc in the motor road for km 5 to of bageshwar dafaut motor road and for km 1 of bagehwar kapkot link motor road
Read moreConstruction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Construction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Read moreConstruction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Read moreRehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads
Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction and maintenance of rd road to jugapadar road under mmsy scheme in the district of rayagada for the year 2026 2027
Construction and maintenance of rd road to jugapadar road under mmsy scheme in the district of rayagada for the year 2026 2027
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreDevelopment and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Development and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Read moreRestoration of rain damages on jia manikaran road km. 1/610 to 35/110 (sh- balance work of metalling and tarring , v-shaped drain,u-shape drain at various reached in km 1/610 to 35/110 under crf (job no crf-hp-2023 -24/188)
Restoration of rain damages on jia manikaran road km. 1/610 to 35/110 (sh- balance work of metalling and tarring , v-shaped drain,u-shape drain at various reached in km 1/610 to 35/110 under crf (job no crf-hp-2023 -24/188)
Read moreof your Industry type