Tender Details
About Tender
🚧 Procurement Opportunity: Di Pipeline Installation Project 🚧 The Chief Engineer, Andaman Public Works Department (Apwd), Invites Bids From Experienced Contractors For The Provision Of A D I Pipeline With A Diameter Of 400mm From Buniyadabad Pump House To Vijay Baugh Junction. The Project Scope Includes Connecting The New Pipeline To The Existing Buniyadabad Di Pumping Line, As Well As The Restoration And Repair Of The Road Work Affected By The Installation. 📅 Bid Submission Deadline: May 9, 2024, 3:00 Pm Tender Fee: Inr 0 Emd: Inr 40,385 Interested Bidders Must Demonstrate Their Capability To Execute The Project In Accordance With The Specifications And Timelines Outlined In The Tender Documents. Detailed Proposals, Including Cost Estimates, Project Methodology, And Compliance With Environmental And Safety Regulations, Are Required. Keywords: Di Pipeline, Infrastructure Project, Andaman Public Works Department, State Government, Ut, Road Restoration, Contractor Bid, Tender, Andaman And Nicobar IslandsParticulars | Details |
---|---|
Title |
Providing Of D I Pipeline 400mm Dia From Buniyadabad Pump House To Vijay Baugh Junction And Making Connection With Existing Buniyadabad Di Pumping Line 400 Mm Dia Including Restoration And Repair Of Road Work
|
Description |
Providing Of D I Pipeline 400mm Dia From Buniyadabad Pump House To Vijay Baugh Junction And Making Connection With Existing Buniyadabad Di Pumping Line 400 Mm Dia Including Restoration And Repair Of Road Work
|
Organisation | Chief Engineer Andaman Public Works Department (APWD) | State Govt. and UT |
Tender Id | 2024_APWD_14178_1 |
Reference Number |
01/EE/SAD/APWD/2024-25 |
Tender Fee | 0 |
EMD | 40385 |
Tender Value | |
Place | EE SAD APWD Port Blair |
Link | https://eprocure.andaman.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=15014 |
Start Date | May 04, 2024 15:30 |
End Date |
09/05/2024 ( Expired 346 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Biennial repair and maintenance of 600mm dia raw water pipe line from old intake pump house jharkhand side to raw water at stps bengal side
Biennial repair and maintenance of 600mm dia raw water pipe line from old intake pump house jharkhand side to raw water at stps bengal side
Read moreAAAAAAAAAA
Login to viewBalance work for road restoration and laying of upvc pipe providing drinking water functional household tap connection (fhtc) by extension of pipeline from existing pwss in the left out arsenic affected habitations within hariharpara raninagar-i ii
Read moreNagpur additional butibori i.a. providing laying jointing and commissioning 900 mm dia di k 9 class pure water rising main 600 mm dia di k 9 class distribution pipeline and construction of 6000 cum rcc sump pump house and 2000 cum capacity esr
Nagpur additional butibori i. a. providing laying jointing and commissioning 900 mm dia di k 9 class pure water rising main 600 mm dia di k 9 class distribution pipeline and construction of 6000 cum rcc sump pump house and 2000 cum capacity esr.
Read moreNasirpur cholka dnit for providing fhtc and distribution pipe line under jjm providing and fixing of fhtc and laying of distribution of 4 i d di pipe line construction of pump
Dnit for providing fhtc and distribution pipe line under jjm providing and fixing of fhtc and laying of distribution of 4 i d di pipe line construction of pump chamber and boundary wall and clear water tank for improvement of water supply in villa
Read moreProviding and laying 300 mm i/d di pipe line from head water works to gurudwara chowk urban estate phase-i bathinda (under deposit work)
Providing and laying 300 mm i/d di pipe line from head water works to gurudwara chowk urban estate phase-i bathinda (under deposit work)
Read more692 -providing and laying of di pipe dia 100 mm from kali mata mandir to petrol pump and branch streets on kami road and from jatwara main road to khari kaun road ward no.1 area under mc sonipat.
692 -providing and laying of di pipe dia 100 mm from kali mata mandir to petrol pump and branch streets on kami road and from jatwara main road to khari kaun road ward no.1 area under mc sonipat.
Read moreLaying rcc pipeline of 300 mm i/d np-2 for irrigation facilities from last hodi of pipeline 65600/l of nolpur disty. for filling village pond bhungerka thukrala pond and providing irrigation facilities. (under atal bhujal yojana) (re-invited)
Laying rcc pipeline of 300 mm i/d np-2 for irrigation facilities from last hodi of pipeline 65600/l of nolpur disty. for filling village pond bhungerka thukrala pond and providing irrigation facilities. (under atal bhujal yojana) (re-invited)
Read moreLaying 300mm i/dia rcc np-2 pipeline for filling bus stand pond dongli from existing hodi of 300mm i/dia rcc np-2 pipeline from km. 8.950/l of shahbazpur disty. for recharging ground water table and providing irrigation facilities (re-invited)
Laying 300mm i/dia rcc np-2 pipeline for filling bus stand pond dongli from existing hodi of 300mm i/dia rcc np-2 pipeline from km. 8.950/l of shahbazpur disty. for recharging ground water table and providing irrigation facilities (re-invited)
Read moreEstimate for providing and laying 450mm dia. rcc np-3 sewer line, making connection with 200mm dia. existing sewer line, p/l of pvc water supply line of 100mm dia. water supply line from old police chowki to sant ravidass mandir and providing and lay
Estimate for providing and laying 450mm dia. rcc np-3 sewer line, making connection with 200mm dia. existing sewer line, p/l of pvc water supply line of 100mm dia. water supply line from old police chowki to sant ravidass mandir and providing and lay
Read moreProviding and laying of di k7 rising main pipeline from existing intermediate pumping station model town upto dussehra ground disposal works and augmentation of pumping machinery at existing ips model town including its 5 years o and m at muktsar
Providing and laying of di k7 rising main pipeline from existing intermediate pumping station model town upto dussehra ground disposal works and augmentation of pumping machinery at existing ips model town including its 5 years o and m at muktsar
Read moreof your Industry type