Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
General Health Department Annual Plan 2023 24 Implementation Of Planscheme Women And Children Hospitals Works At Women And Children Hospitals Thrissur Balance Electrical Work General Electrical Work
|
Description |
General Health Department Annual Plan 2023 24 Implementation Of Planscheme Women And Children Hospitals Works At Women And Children Hospitals Thrissur Balance Electrical Work General Electrical Work
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_705624_1 |
Reference Number |
PWD/BLDG/8528/2024-2025 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | Thrissur |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1156978 |
Start Date | January 17, 2025 00:00 |
End Date |
23/01/2025 ( Expired 147 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreBalance work under provision of high security boundary wall with concertina coil of barbed wire ,main guard room and security watch towers at frazerganj under ge(i) (cgn) kolk
Balance work under provision of high security boundary wall with concertina coil of barbed wire ,main guard room and security watch towers at frazerganj under ge(i) (cgn) kolk
Read moreRepair maint of external electrical distribution system and other misc e m works
Repair maint of external electrical distribution system and other misc e m works at aftc cqae we and afs jalahalli
Read moreRenewal and replacement of damaged roof paint electrical wiring water supply sanitary and other allied civil works at east division pspcl amritsar
Renewal and replacement of damaged roof paint electrical wiring water supply sanitary and other allied civil works at east division pspcl amritsar
Read moreAcoustical interior work, stage craft work, projection system, sitting arrangement, sound system, stage light arrangement, false ceiling work and internal electrical work of newly constructed community centre at dvc, rtps.
Acoustical interior work, stage craft work, projection system, sitting arrangement, sound system, stage light arrangement, false ceiling work and internal electrical work of newly constructed community centre at dvc, rtps.
Read moreWork of overhauling of 145 kv sf-6 circuit breaker, general maintenance and servicing of 36 kv vcb and repairing of battery charger at 132 kv s/s kasia, rajapakar and laxmipur under etd-i, gorakhpur
Work of overhauling of 145 kv sf-6 circuit breaker, general maintenance and servicing of 36 kv vcb and repairing of battery charger at 132 kv s/s kasia, rajapakar and laxmipur under etd-i, gorakhpur
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreDesign and construction of grade separator
Design construction of 
 grade separators at perungudi junction and srp tools junction
 including service road, electrical, drainage and misc works
Read moreof your Industry type