Tender Details
Particulars | Details |
---|---|
Title |
Additional Kms For Periodic Renewal Under Annual Maintenance Plan 2025 26 On 1 Dungri To Tooh Road Km 0/00 To 1 00 3 00 To 4 00 2 Bhareri Bhour Via Badehar Road Km 1 00 To 2 00
|
Description |
Sh P L 25mm Thick B C
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2000 |
EMD | 53000 |
Tender Value | |
Place | Bhoranj |
Link |
AAAAAAAAAA Login to view |
Start Date | May 30, 2025 15:30 |
End Date |
04/06/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreUpgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Read moreUnder state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Under state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Read moreRate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr pcc poles under the ed-i parade, jammu for fy 2025-26 labour only.
Rate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr pcc poles under the ed-i parade, jammu for fy 2025-26 labour only.
Read moreRate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr st poles under the ed-i parade, jammu for fy 2025-26 labour only.
Rate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr st poles under the ed-i parade, jammu for fy 2025-26 labour only.
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreSupply and stacking of various materials for maintenance of road 32 ml raisinghnagar approach road 0.360 km and sardarpur bika dabla between km 0.00 to 27.618 during year 2025 26 under aor of 141 dmc 49 brtf project chetak in the state of rajasthan
Supply and stacking of various materials for maintenance of road 32 ml raisinghnagar approach road 0.360 km and sardarpur bika dabla between km 0.00 to 27.618 during year 2025 26 under aor of 141 dmc 49 brtf project chetak in the state of rajasthan
Read moreB.t renewal work on manawar -mangod road (sh-37) in km 1 to 50.41 (total length 50.41 kms)
B.t renewal work on manawar -mangod road (sh-37) in km 1 to 50.41 (total length 50.41 kms)
Read moreof your Industry type