Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Badly Damaged Rusted Towers From Loc No1 To 11 In 400 Kv Kalapaka Khammam Asupaka Tmdc Line In 400 Kv Omc Circle Visakhapatnam
|
Description |
Replacement Of Badly Damaged Rusted Towers From Loc No1 To 11 In 400 Kv Kalapaka Khammam Asupaka Tmdc Line In 400 Kv Omc Circle Visakhapatnam
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 765368 |
Reference Number |
E proc No 22/24-25 |
Tender Fee | 11800 |
EMD | 7.75 Lakh |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | November 15, 2024 19:30 |
End Date |
10/12/2024 ( Expired 156 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreRe routing of water supply pipe line of 200mm dia. at western sector.
Re routing of water supply pipe line of 200mm dia. from pcr jn. pump house to ins dega along nhai fly over bridge of visakhapatnam port authority junction in western sector.
Read moreNctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Read moreRepair and replacement of water supply line
Repair and replacement of water supply line of old/rusted and damaged gi pipe line of type-ii quarter no, 2001 to 2420 total 420 nos quarters (28 block) of b block at group centre avadi chennai
Read moreQuantum of work involved in annual maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to accident of vechile, theft of wire and heavy storm (daiviya aapda) etc. in the area of e.d.s.d.-ii safipur under the electricity dis
Quantum of work involved in annual maintenance and replacement of 33 kv, 11 kv and l.t. line which are damaged due to accident of vechile, theft of wire and heavy storm (daiviya aapda) etc. in the area of e.d.s.d.-ii safipur under the electricity dis
Read moreSupply, erection, testing and commissioning of (a) 132kv ss valigonda and 132kv dc/sc line (17.5km) from ramannapet ss (b) 132kv dhandumalkapur ss and 132kv dc line (17.5km) from 400kv choutuppal ss in yadadri - bhongir district (c) 132kv dc/sc line (13km) from 220kv ss madgula to 132kv ss godakandla in nalgonda district on turnkey basis.
Supply, erection, testing and commissioning of (a) 132kv valigonda ss and 132kv dc/sc line (17.5km) from 132kv ramannapet ss (b) 132kv dhandumalkapur ss and 132kv dc line (17.5km) from 400kv choutuppal ss in yadadri-bhongir district (c) 132kv dc/sc line (13km) from existing 220kv ss madgula ss to 132kv ss godakandla in nalgonda district on turnkey basis.
Read moreReplacement of damaged overhead fire water tank along with plumbing line and fixtures and repairs_replacement to plumbing fixtures in various toilets of laboratory building and other miscellaneous works at fda complex, bambolim goa.
Replacement of damaged overhead fire water tank along with plumbing line and fixtures and repairs_replacement to plumbing fixtures in various toilets of laboratory building and other miscellaneous works at fda complex, bambolim goa.
Read moreLaying distribution main pipe line from 2nd pump house to distribution system, repairing of damaged fhtc, construction of valve chembers and its allied works of sasra pwss in gopiballavpur-i block within jhargram district under jhargram division, phe
Laying distribution main pipe line from 2nd pump house to distribution system, repairing of damaged fhtc, construction of valve chembers and its allied works of sasra pwss in gopiballavpur-i block within jhargram district under jhargram division, phe
Read moreQuantum of work involved in maintenance and replacement of 33 kv,11 kv, and l.t. line which are damaged due to accident of vehicle, theft of wire and heavy storm(daiviya aapda)etc in the area of e.d.s.d.-i, purwa and e.d.s.d.-maurwan, unnao
Quantum of work involved in maintenance and replacement of 33 kv,11 kv, and l.t. line which are damaged due to accident of vehicle, theft of wire and heavy storm(daiviya aapda)etc in the area of e.d.s.d.-i, purwa and e.d.s.d.-maurwan, unnao
Read moreReinstatement of road damaged for laying natural gas pipeline from wholesale fish market to colva beach road via madel and from arlem circle to durga petrol pump in fatorda constituency.
Reinstatement of road damaged for laying natural gas pipeline from wholesale fish market to colva beach road via madel and from arlem circle to durga petrol pump in fatorda constituency.
Read moreof your Industry type