Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Guntakal Division: Sse/P.Way/Ru ( Renigunta 1 Yard) &Amp Sse/P.Way/Vki ( Venkatagiri ,Yellakaru &Amp Nidigallu 3 Yards) Jurisdiction: Proposed Safety Related Yard Improvement &Amp Upgradation Works At Various Yards Under Aden/Ru Sub Division.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 83569409 |
|
Reference Number |
Engg-GTL-South-1902 |
| Tender Fee | 0 |
| EMD | 6.33 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83569409/viewNitPdf_5071755.pdf |
| Start Date | August 26, 2025 21:53 |
| End Date |
Expired
23/09/2025
Expired 390 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ru-gy section: side drain for a length of 2.350km in sse/p.way/gy section under den/central jurisdiction.
Ru-gy section: side drain for a length of 2.350km in sse/p.way/gy section under den/central jurisdiction.
Read moreComposite work (civil + p.way works) in connection with improvement and up-gradation of belha yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.
Composite work (civil + p.way works) in connection with improvement and up-gradation of belha yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.
Read moreComposite work (civil + p.way works) in connection with improvement and up-gradation of hathband yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/tilda.
Composite work (civil + p.way works) in connection with improvement and up-gradation of hathband yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/tilda.
Read moreComposite work (civil + p.way works) in connection with improvement and up-gradation of nipania yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.
Composite work (civil + p.way works) in connection with improvement and up-gradation of nipania yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.
Read moreSc division- wd-sc section: sw-i::proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up & dn lines including station yard lines in sse/p.way/sem section under aden/tdu sub division.sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up & dn lines including station yard lines in sse/p.way/tdu section under aden/tdu sub division.
Sc division- wd-sc section: sw-i::proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up & dn lines including station yard lines in sse/p.way/sem section under aden/tdu sub division.sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up & dn lines including station yard lines in sse/p.way/tdu section under aden/tdu sub division.
Read moreSecunderabad division -bpq-kzj & magh-gdcr sections:-sw-i: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn,ud & sl lines including station yard lines in sse/p.way/magh section sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/skzr section sw-iii: proposed safety rel
Secunderabad division -bpq-kzj & magh-gdcr sections:-sw-i: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn,ud & sl lines including station yard lines in sse/p.way/magh section sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/skzr section sw-iii: proposed safety rel
Read moreSecunderabad division -bpq-kzj section-sw-i: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/mci section sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/pdpl section sw-iii: proposed safety related track maintenance
Secunderabad division -bpq-kzj section-sw-i: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/mci section sw-ii: proposed safety related track maintenance works & miscellaneous track works (other than safety related track items) on up,dn & ud lines including station yard lines in sse/p.way/pdpl section sw-iii: proposed safety related track maintenance
Read morePdpl-nzb section: sw-1: proposed safety related track maintenance works and miscellaneous track works (other than safety related track items) on single line including station yard lines in sse/p. way/krmr section & sw-ii: proposed safety related track maintenance works and miscellaneous track works (other than safety related track items) on single line including station yard lines in sse/p.way/armu section under aden/krmr sub-division.
Pdpl-nzb section: sw-1: proposed safety related track maintenance works and miscellaneous track works (other than safety related track items) on single line including station yard lines in sse/p. way/krmr section & sw-ii: proposed safety related track maintenance works and miscellaneous track works (other than safety related track items) on single line including station yard lines in sse/p.way/armu section under aden/krmr sub-division.
Read more(a)proposed extension(150 m) of ngp end shunting neck to convert track machine siding at pulgaon yard(csr=280 m)under sse(p.way)pulgaon section under aden wardha sub-division.(b)ngp division casual renewal of cs,cmsc,tws,ds & ttr(tfr).(c)ngp division-casual renewal of rails=3.34 kms & casual renewal of sleepers=3.34 kms.(d)nagpur division-replacement of overaged sej by twsej-41 sets. (e)ttr(fs+tws+wcmsc)=8nos(1 in 8.5=5nos,1 in 12=3nos)g.total=8 nos in branch line of ngp division.(f)pr
(a)proposed extension(150 m) of ngp end shunting neck to convert track machine siding at pulgaon yard(csr=280 m)under sse(p.way)pulgaon section under aden wardha sub-division.(b)ngp division casual renewal of cs,cmsc,tws,ds & ttr(tfr).(c)ngp division-casual renewal of rails=3.34 kms & casual renewal of sleepers=3.34 kms.(d)nagpur division-replacement of overaged sej by twsej-41 sets. (e)ttr(fs+tws+wcmsc)=8nos(1 in 8.5=5nos,1 in 12=3nos)g.total=8 nos in branch line of ngp division.(f)pr
Read more1 in 12 tws turnout for 22.9t axle load for 10125 mm curved switch with 60e1a1 thick web tongue rails for 1 in 12 turnout b.g. (1673 mm) for 60e1 rail with r260 grade on psc sleepers (drawings and item details as mentioned in set document are applicable) drg: (rdso) rdso/t-8780 alt.4 spec: (rdso) irs/t-10-2025 set doc: set_rt_8780_ alt_4.precruving requirements as per the perm yard (sse/p.way/con-i/dmv) is must. attached calculation sheet with tender to be refered to for precurving requirement
1 in 12 tws turnout for 22.9t axle load for 10125 mm curved switch with 60e1a1 thick web tongue rails for 1 in 12 turnout b.g. (1673 mm) for 60e1 rail with r260 grade on psc sleepers (drawings and item details as mentioned in set document are applicable) drg: (rdso) rdso/t-8780 alt.4 spec: (rdso) irs/t-10-2025 set doc: set_rt_8780_ alt_4.precruving requirements as per the perm yard (sse/p.way/con-i/dmv) is must. attached calculation sheet with tender to be refered to for precurving requirement
Read moreof your Industry type