Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Centralised Ac Plant Attending Breakdown Works In Ac Compressor No 2 And 3 Ac Cooling Tower Fans Air Handling Units Air Washer System Circulating Water Pumps Pipe Lines And Valves Etc For A Period Of 365 Days
|
Description |
Mtps I Mill Plant Centralised Ac Plant Attending Breakdown Works In Ac Compressor No 2 And 3 Ac Cooling Tower Fans Air Handling Units Air Washer System Circulating Water Pumps Pipe Lines And Valves Etc For A Period Of 365 Days
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_530576_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.317/ 2024-25 |
Tender Fee | 0 |
EMD | 7400 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631647 |
Start Date | March 07, 2025 00:00 |
End Date |
20/03/2025 ( Expired 99 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreMtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days
Mtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days
Read moreMtps i mill plant ac plant replacement of existing damaged air duct outside the conference hall ahu room renewal of insulation extending supply air duct in ce office and providing down comer spool piece towards ups panels etc
Mtps i mill plant ac plant replacement of existing damaged air duct outside the conference hall ahu room renewal of insulation extending supply air duct in ce office and providing down comer spool piece towards ups panels etc
Read moreMtps i boiler rotating parts units iii and iv prive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Mtps i boiler rotating parts units iii and iv prive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Read moreRepair and replacement of central ac plant ducts cooling coils tower air handling units compartments filters chillers tanks indoor grills lt panels and other allied works under ge i gos
Repair and replacement of central ac plant ducts cooling coils tower air handling units compartments filters chillers tanks indoor grills lt panels and other allied works under ge i gos
Read moreTtps mech ii tm i breakdown works in boiler feed water system stator water primary secondary pumps hydrogen cooler booster pumps, chemical dosing pumps and connected cooling water lines in units i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i breakdown works in boiler feed water system stator water primary secondary pumps hydrogen cooler booster pumps, chemical dosing pumps and connected cooling water lines in units i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026
Read moreof your Industry type