Tender Details
Particulars | Details |
---|---|
Title |
Pasture Development And Horticulture Plantation Work In Gp Agyara Pmksy 2.0 Block Ramgarh (Package No. 01)
|
Description |
Pasture Development And Horticulture Plantation Work In Gp Agyara Pmksy 2.0 Block Ramgarh (Package No. 01)
|
Organisation | Deptt. of Watershed Dev. and Soil Conservation | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 97960 |
Tender Value | |
Place | Ramgarh |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 15:30 |
End Date |
17/05/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreDevelopment of muktidham at mathikatola in ward no. 01 under nagar parishad nowrozabad.
Development of muktidham at mathikatola in ward no. 01 under nagar parishad nowrozabad.
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreDrain and cross const. work at proposed locations in ravishankar nagar and suraj nagar ward no. 29
Drain and cross construction work at proposed locations in ravishankar nagar and suraj nagar under ward number 29.
Read moreBeautification and boundrywall and light and gate construction work at ward no 15 in front of piyush choudhry house municipal council narmadapuram mp.
Beautification and boundrywall and light and gate construction work at ward no 15 in front of piyush choudhry house municipal council narmadapuram mp.
Read moreProviding and fixing pavers block and piching work vindhyavashini taliya ward no 04 muncipal area chhatarpur
Providing and fixing pavers block and piching work vindhyavashini taliya ward no 04 muncipal area chhatarpur
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreof your Industry type