Tender Details
About Tender
🚂 Procurement Notice: P Way Maintenance Work On Rgu Jsb Section 🛤️ The Ministry Of Railways, Specifically The North Central Railway, Is Seeking Bids For The Maintenance Of The P Way (Permanent Way) On The Rgu Jsb Section, Which Includes The Khairar Bhimsen Doubling Work Under The Jurisdiction Of The Sr. Divisional Engineer (East)/Jhansi. 📅 Bid Submission Deadline: May 31, 2024, 3:00 Pm Interested Contractors Must Submit An Earnest Money Deposit (Emd) Of Inr 207,000/ And Provide A Detailed Bid As Per The Tender Document For Comprehensive Deion And Other Specifications. Keywords: P Way Maintenance, Railway Infrastructure, North Central Railway, Ministry Of Railways, Tender, Emd, Jhansi Division, Khairar Bhimsen Doubling WorkParticulars | Details |
---|---|
Title |
P Way Maintenance Work On Rgu Jsb Section In C/With Khairar Bhimsen Doubling Work Under Sr. Divisional Engineer (East)/Jhansi In Jhansi Division Of North Central Railway
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74780196 |
Reference Number |
CNB2024202502 |
Tender Fee | 0 |
EMD | 2.07 Lakh |
Tender Value | |
Place | Allahabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74780196/viewNitPdf_4548193.pdf |
Start Date | May 10, 2024 23:21 |
End Date |
31/05/2024 ( Expired 347 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t
Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreWork of electrification of control room of borivali hill reservoir no 1 with necessary other electrical works in the premises of borivali hill reservoir no i ii and iii under a e w w maint w s north ii division
Work of electrification of control room of borivali hill reservoir no 1 with necessary other electrical works in the premises of borivali hill reservoir no i ii and iii under a e w w maint w s north ii division
Read moreWork of removing floating material from screen at bharat nagar railway culvert in f north ward during monsoon under the section of dyche o n m swd
Work of removing floating material from screen at bharat nagar railway culvert in f north ward during monsoon under the section of dyche o n m swd
Read moreExtension of vehicle maintenance shed situated on plot bearing cts no. 108 c/1 of village hariyali in kanjurmarg (w) comes under ex.eng.(tr.) es division
Extension of vehicle maintenance shed situated on plot bearing cts no. 108 c/1 of village hariyali in kanjurmarg (w) comes under ex.eng.(tr.) es division
Read moreZonal work of maintenance, patch repair of roads in p.w.d. division no. 1, narmadapuram (for f.y. 2025-26). 1st call, pac rs. 50.00 lacs on road bridge works sor 11.04.2025 (ammendment upto date), completion period 365 days i/c rainy season.
Zonal work of maintenance, patch repair of roads in p.w.d. division no. 1, narmadapuram (for f.y. 2025-26). 1st call, pac rs. 50.00 lacs on road bridge works sor 11.04.2025 (ammendment upto date), completion period 365 days i/c rainy season.
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreConstruction of w.b.m. road in north east section and construction of drainage channel 295 mtr. length with 01 mtr. wide form east-west of ne section at rac, under bau, kanke ranchi
Construction of w.b.m. road in north east section and construction of drainage channel 295 mtr. length with 01 mtr. wide form east-west of ne section at rac, under bau, kanke ranchi
Read moreZonal contract for the patch repair and maintenance of roads, bridges and culvert i/c road furniture with maintenance of various roads including roads under performance guarantee and other required work under pwd division, narsinghpur district narsin
Zonal contract for the patch repair and maintenance of roads, bridges and culvert i/c road furniture with maintenance of various roads including roads under performance guarantee and other required work under pwd division, narsinghpur district narsin
Read moreSpecial repairs to roof treatment of gandhi block facility centres provn of roof treatment in bldg no p 179 single offrs living and addn altn with brick work and parapet wall in 36 qtrs in dhruva complex at cdm under age b r n no ii of ge north secu
Special repairs to roof treatment of gandhi block facility centres provn of roof treatment in bldg no p 179 single offrs living and addn altn with brick work and parapet wall in 36 qtrs in dhruva complex at cdm under age b r n no ii of ge north secu
Read moreof your Industry type