Tender Details
Particulars | Details |
---|---|
Title |
Stripping, Grit Blasting, Repair Of Bogie Frames And Overhauling Of Springs Of
Icf/Lhb Coaches As Per Scope Of Work In Motibagh Workshop, Nagpur.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79705886 |
Reference Number |
MIBW-24-19-06-09-01-Main |
Tender Fee | 0 |
EMD | 3.16 Lakh |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79705886/viewNitPdf_4842519.pdf |
Start Date | January 23, 2025 00:24 |
End Date |
13/02/2025 ( Expired 114 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Under the hariyalo rajasthan campaign, work of planting and maintenance of trees as per the need at various places in the jurisdiction of the authority. (biennial)
Under the hariyalo rajasthan campaign, work of planting and maintenance of trees as per the need at various places in the jurisdiction of the authority. (biennial)
Read moreProviding cleaning and housekeeping staff at regional office, data centre powerhouse /sc hyderabad in telangana state, vijayawada and tirupathi in andhra pradesh state on outsource basis for the office of the ped/railtel as per the schedule of work
Providing cleaning and housekeeping staff at regional office, data centre powerhouse /sc hyderabad in telangana state, vijayawada and tirupathi in andhra pradesh state on outsource basis for the office of the ped/railtel as per the schedule of work
Read moreTit bit civil work along with roof treatment in gotera 33 11 kv sub station at kalyani division in the district of nadia estimate is prepared as per pwd sor in the area of kalyani sub division w ef 01 01 2017 and all other corrigenda uptodate
Tit bit civil work along with roof treatment in gotera 33 11 kv sub station at kalyani division in the district of nadia estimate is prepared as per pwd sor in the area of kalyani sub division w ef 01 01 2017 and all other corrigenda uptodate &#x0d &#x0d
Read moreSupply of 3u vpx data acquisition board as per qty and scope of work in mentioned in annexure t1 and acceptance procedure mentioned in annexure-t2, to ecil-hyderabad.
Supply of 3u vpx data acquisition board as per qty and scope of work in mentioned in annexure t1 and acceptance procedure mentioned in annexure-t2, to ecil-hyderabad.
Read moreSupply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Read moreProvn of toilet and bathroom block at loma and provn of toilet block at chumathang and spl repair/replacement of existing wiring in the unit and demarcating circuits as per sector works at karu under ge 860 ews
Provn of toilet and bathroom block at loma and provn of toilet block at chumathang and spl repair/replacement of existing wiring in the unit and demarcating circuits as per sector works at karu under ge 860 ews
Read moreOperation and maintenance of alirajpur lift irrigation scheme for 03 years including its pressurized pipe distribution network for irrigation in 35000 hectares cca on turnkey contract as per detailed scope of work (but not limited of that).
Operation and maintenance of alirajpur lift irrigation scheme for 03 years including its pressurized pipe distribution network for irrigation in 35000 hectares cca on turnkey contract as per detailed scope of work (but not limited of that).
Read moreLump sum one time repair overhauling fixing of 2 nos. piezometer by repairing of various damaged items as per requirement items installed in piezometers at pauni ii expansion mine under pauni sub area of ba
Lump sum one time repair overhauling fixing of 2 nos. piezometer by repairing of various damaged items as per requirement items installed in piezometers at pauni ii expansion mine under pauni sub area of ba
Read moreUnder ward operation kayakalp, the work of completing the remaining work of divyang toilet and kitchen in primary kalibari as per the saturated parameters.
Under ward operation kayakalp, the work of completing the remaining work of divyang toilet and kitchen in primary kalibari as per the saturated parameters.
Read moreInstallation 215 nos and repairing 18 nos work of rain water harvesting work at various location in ratlam city as per estimate and conditions
Installation 215 nos and repairing 18 nos work of rain water harvesting work at various location in ratlam city as per estimate and conditions
Read moreof your Industry type