Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Preparation Of Dpr For Short Term And Long Term Measures On The Kashipur Sitarganj Section From Ch 175 To Km 252.200 Of Nh 74 New Nh 309 And 9 In The State Of Uttarakhand And Uttar Pradesh
|
| Description |
Consultancy Services For Preparation Of Dpr For Short Term And Long Term Measures On The Kashipur Sitarganj Section From Ch 175 To Km 252.200 Of Nh 74 New Nh 309 And 9 In The State Of Uttarakhand And Uttar Pradesh
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_250372_1 |
|
Reference Number |
NHAIPIUrudrapur16/2025 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | Udham Singh Nagar |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=287175 |
| Start Date | September 25, 2025 19:00 |
| End Date |
Expired
23/10/2025
Expired 356 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Short term maintenance contract (stmc) work for the stretch of nh-87 (new nh-109) in km. 90 to 106 and km 116 to 120 in the state of uttarakhand
Short term maintenance contract (stmc) work for the stretch of nh-87 (new nh-109) in km. 90 to 106 and km 116 to 120 in the state of uttarakhand
Read moreShort term improvement and routine maintenance of km. 34/480 to 74/00 (for vartej dhasa section) of nh-51 in the state of gujarat.
Short term improvement and routine maintenance of km. 34/480 to 74/00 (for vartej dhasa section) of nh-51 in the state of gujarat.
Read moreShort term maintenance contract stmc of road from km 180 to km 254 raipur to jagdalpur road total length 74 km of nh 30 in the state of chhattisgarh
Short term maintenance contract stmc of road from km 180 to km 254 raipur to jagdalpur road total length 74 km of nh 30 in the state of chhattisgarh
Read moreConsultancy services for preparation of dpr for upgradation of nh109k from km 29 to km 234 bangapani to gwaldham to 2lps and geometric improvement along with pavement design road safety measures treatment of landslide areas and upgradation of bridge
Nh-109k from km 29 to km 234 bangapani to gwaldham to 2lps and geometric improvement along with pavement design road safety measures treatment of landslide areas and upgradation of bridges from km 234 to km 296 gwaldham to simli in the state of uk.
Read moreShort term improvement and routine maintenance work road pavement repairs work on section dhasa-gadhada-botad road (between km. 74/00 to 119/500) of nh-51 in the state of gujarat.
Short term improvement and routine maintenance work road pavement repairs work on section dhasa-gadhada-botad road (between km. 74/00 to 119/500) of nh-51 in the state of gujarat.
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a.
Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (bataghat to maletha) on nh-707a in the state of uttarakhand. (length 136 km).
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707a.
Widening of existing single / intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (tyuni to bataghat) of nh-707ain the state of uttarakhand. (length-175 km).
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a in the state of uttarakhand. (length 80 km).
Read moreConsultancy services for preparation of detailed project report dpr and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 235.00 jyolikot to karanprayag of nh-109 (old nh 87ext) in the state of uttarakhand.(length- 235 km).
Read morePeriodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand
Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand
Read moreof your Industry type