Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Hard Drawn Stranded Copper Cross Feeder 🔗 The Ministry Of Railways, Specifically The Central Government Ministry/Department, Is Seeking Bids For The Supply Of Hard Drawn Stranded Copper Cross Feeder To Be Installed In Jabalpur. 🛠️ 📅 Bid Submission Deadline: May 24, 2024, 12:30 Pm Interested Bidders Are Advised To Review The Complete Tender Document For Detailed Specifications, Deion Requirements, And Submission Guidelines. Keywords: Hard Drawn Stranded Copper, Cross Feeder, Ministry Of Railways, Government Tender, Electrical Equipment, Jabalpur| Particulars | Details |
|---|---|
| Title |
Hard Drawn Stranded Copper Cross Feeder .
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106347251 |
|
Reference Number |
94245368 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106347251/viewNitPdf_4572216.pdf |
| Start Date | May 15, 2024 22:08 |
| End Date |
Expired
24/05/2024
Expired 853 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reactive power compensation at 11kv feeder level by installing capacitor units in davanagere and harihara divisions of bescom jurisdictions on total turnkey on percentage quoting basis for a period of one year
Reactive power compensation at 11kv feeder level by installing capacitor units in davanagere and harihara divisions of bescom jurisdictions on total turnkey on percentage quoting basis for a period of one year
Read more1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
Read more1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreHard drawn stranded copper cross feeder .
For complete deion and other details, please refer to tender
Read more150 sq.mm. hard drawn stranded copper cross feeder wire
For complete deion and other details, please refer to tender
Read more150 sqmm hard drawn stranded copper cross feeder wire
For complete deion and other details, please refer to tender
Read more150 sq.mm. hard drawn stranded copper cross feeder wire
For complete deion and other details, please refer to tender
Read moreof your Industry type