Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Tender Announcement: Mtps I Civil Circle Construction Project 🏗️ Tneb Limited, A State Government Undertaking, Is Seeking Bids From Experienced Contractors For The Removal Of Damaged Concrete And The Laying Of Micro Concrete Using Construction Chemicals At The 18 M Feeder Floor Of Unit Iii At Mtps I, Located At Mettur Thermal Power Station I / Mettur Dam. 📅 Bid Submission Deadline: July 15, 2024, 2:00 Pm Tender Fee: Inr 0 Emd: Inr 6800 Interested Bidders Should Submit Detailed Proposals, Including Methodology, Timelines, And Cost Estimates, Adhering To The Specifications Outlined In The Tender Document. Keywords: Mtps I, Civil Circle, Construction, Concrete Repair, Micro Concrete, Tneb Limited, State Govt. And Ut, Tender, Bid Submission, Emd| Particulars | Details |
|---|---|
| Title |
Mtps I Civil Circle Removing The Damaged Concrete And Laying Micro Concrete Using Construction Chemicals At 18 M Feeder Floor Of Unit Iii At Mtps I
|
| Description |
Mtps I Civil Circle Removing The Damaged Concrete And Laying Micro Concrete Using Construction Chemicals At 18 M Feeder Floor Of Unit Iii At Mtps I
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_458823_1 |
|
Reference Number |
CE / MTPS-I / SE/ CIVIL / OT.NO. 04 / 2024-25 |
| Tender Fee | 0 |
| EMD | 6800 |
| Tender Value | - |
| Place | Mettur Thermal Power Station I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=545430 |
| Start Date | July 01, 2024 22:30 |
| End Date |
Expired
15/07/2024
Expired 822 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i - civil circle - replacing the damaged acc sheets with new galvalume sheets (0.8 mm) for the roof top of boiler unit i at mtps i
Mtps i - civil circle - replacing the damaged acc sheets with new galvalume sheets (0.8 mm) for the roof top of boiler unit i at mtps i
Read moreMtps i - civil circle replacing the existing damaged ac sheets/ridge pieces with new one of ac sheets and galvalume sheets of thickness not less than 0.8 mm for roofing and all sides of unit ii at mtps i
Mtps i - civil circle replacing the existing damaged ac sheets/ridge pieces with new one of ac sheets and galvalume sheets of thickness not less than 0.8 mm for roofing and all sides of unit ii at mtps i
Read moreMtps i civil circle improvement works by replacing the existing damaged ac sheets / ridge pieces with new galvalume corrugated sheets of thickness not less than 0.8 mm for roofing of the primary crusher house in chp area at mtps i
Mtps i civil circle improvement works by replacing the existing damaged ac sheets / ridge pieces with new galvalume corrugated sheets of thickness not less than 0.8 mm for roofing of the primary crusher house in chp area at mtps i
Read moreNctps ii civil maintenance circle civil maintenance division replacing the damaged false ceiling for aee s ae s purchase wing room at service building ground floor
Nctps ii civil maintenance circle civil maintenance division replacing the damaged false ceiling for aee s ae s purchase wing room at service building ground floor
Read moreBifurcation of the existing 11kv dnm colony feeder emanating from 33/11kv lodha indoor ss by using existing idle 11kv capacitor bank breaker and laying of 0.5 km 11kv 3x300 sqmm xlpe ug cable (double run) in sanathnagar section of sanathnagar subdivision in greenlands division and the work will be executed by the construction wing of banjara hills circle
Bifurcation of the existing 11kv dnm colony feeder emanating from 33/11kv lodha indoor ss by using existing idle 11kv capacitor bank breaker and laying of 0.5 km 11kv 3x300 sqmm xlpe ug cable (double run) in sanathnagar section of sanathnagar subdivision in greenlands division and the work will be executed by the construction wing of banjara hills circle
Read moreBifurcation of the existing 11kv fathenagar feeder emanating from 33/11kv lodha indoor ss by using existing idle 11kv breaker and laying of 1.4 km 11kv 3x300 sq.mm xlpe ug cable (single run) in sanathnagar section of sanathnagar sub-division in greenlands division and the work will be executed by the construction wing of banjara hills circle under t and d improvements works under sc reserved category
Bifurcation of the existing 11kv fathenagar feeder emanating from 33/11kv lodha indoor ss by using existing idle 11kv breaker and laying of 1.4 km 11kv 3x300 sq.mm xlpe ug cable (single run) in sanathnagar section of sanathnagar sub-division in greenlands division and the work will be executed by the construction wing of banjara hills circle under t and d improvements works under sc reserved category
Read moreSupply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Supply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Read moreMtps i - civil circle - rectification works by plastering using construction chemicals to the damaged area of stacks opening doors 1 to 11 by providing micro concrete in cooling tower ii
Mtps i - civil circle - rectification works by plastering using construction chemicals to the damaged area of stacks opening doors 1 to 11 by providing micro concrete in cooling tower ii
Read moreMtps i civil circle rectification works by plastering using construction chemicals to the damaged area of stacks opening doors 1 to 11 by providing micro concrete in cooling tower-i
Mtps i civil circle rectification works by plastering using construction chemicals to the damaged area of stacks opening doors 1 to 11 by providing micro concrete in cooling tower-i
Read moreMtps i - civil circle - rectification works by plastering using construction chemicals to the damaged area of louvers in the cells 1 to 11 by providing micro concrete in cooling tower ii
Mtps i - civil circle - rectification works by plastering using construction chemicals to the damaged area of louvers in the cells 1 to 11 by providing micro concrete in cooling tower ii
Read moreof your Industry type