Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nhidcl/Nh 07/Slope Protection/Uk/Pkg Iii/2023
|
| Description |
Construction For Mitigation Measures Of 05 Nos. Landslides, 05 Nos. Sinking Zones And 1 No. Bridge From Ch. 450.00 To Ch. 468.00 (18 Km. Length) On Nh 07 On Epc Mode In The State Of Uttarakhand (Package Iii)
|
| Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
| Tender Id | 2023_NHIDC_784113_1 |
|
Reference Number |
- |
| Tender Fee | 23600 |
| EMD | 1.88 Crore |
| Tender Value | - |
| Place | Uttarakhand |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=824237 |
| Start Date | January 15, 2024 14:30 |
| End Date |
Expired
06/03/2024
Expired 927 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nhidcl/nh-07/slope protection/uk/pkg-i/2023
Construction for mitigation measures of 10 nos. of landslides, 01 no. sinking zone and 01 no. minor bridge from km 386.000 to km 433.000 (65 km length) on nh-07 on epc mode in the state of uttarakhand, pkg-i
Read moreNhidcl/nh-07/slope protection/ut/pkg-ii/2023
Construction for mitigation measures of 05 nos. landslides, 05 nos. sinking zones from ch. 433.00 to ch. 450.00 (17 km. length) on nh-07 on epc mode in the state of uttarakhand (package-ii)
Read moreNhidcl/uk/nh-07/p123/ae/2024
Consultancy services as ae for supervision of construction of mitigation measures on nh-07 (old nh-58) on epc mode in the state of uttarakhand on epc mode in the state of uttarakhand (package-i, ii and iii)
Read moreNhidcl/uk/dpr/nh-07/ sinking-sliding- pagalnallah
Cs for preparation of dpr and providing services for pre-construction activities in respect of rehabilitation and resettlement of sinking zones and sliding zones and construction of tunnel at pagal nallah location in the state of uttarakhand
Read moreNhidcl/jk/nh-501/ khanabal-baltal/ pkg-iii/2023-24
Widening and upgradation to 2-lane with paved shoulder from km 39.450, of pahalgam bypass to km 60.680, chandanwadi, package-iii of
 khanabal - pahalgam - chandanwadi - baltal section of nh-501 in the ut
 of jammu and kashmir
Read moreNhidcl/tripura/nh-208a /kailashr-kurti br/pkg-iii
Rehabilitation and up-gradation of road from design km 25.250 to km 36.460 of kailashahar - kurti bridge section of nh-208a to two lane with paved shoulder in the state of tripura on epc mode (package-iii)-balance work
Read moreNhidcl/tcp/dpr/uk/2023
Consultancy services for preparation of dpr for tcp at near gmvn guest house, nala guptkashi, near sersi, ukhimath, gangnani hot water spring and gangotri dham in the state of uttarakhand
Read moreNhidcl /meghalaya/shillong-dawki (pkg-iii)/pynurslabypass/2023
Improvement to 2-lane with paved shoulder of old nh-40 (new nh-206) from km 37.550 to km 45.760 (design km 0.000 to km 7.760, design length 7.760 km) (package-iii) pynursla bypass on epc mode in the state of meghalaya.
Read moreNhidcl/ar.pr./nh-15 /b-c (pkg-ii)/2023
Improvement and widening to two lane with paved shoulder of nh-15 (old nh-52) from (kamlang t-junction to chowkham, (pkg-02) in the state of arunachal pradesh
Read moreNhidcl/ro-shg/s-d /pkg-iii/nh-40 /2024/09
Performance based maintenance contract under original repair (contract maintenance) works at selected locations between the stretch shillong-dawki pkg-iii (from km 123.800 to km 131.820) of nh-40 along the existing road (total length 8.02 km) in th
Read moreof your Industry type