Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of Agartala Town Road During The Year 2025 26 Under The Jurisdiction Of Banamalipuir Area Sh Repair Of Road By Providing Carpeting, Grouting, Patch Carpeting Inc Mtc. Of Road Side Drain Etc
|
| Description |
Maintenance Of Agartala Town Road During The Year 2025 26 Under The Jurisdiction Of Banamalipuir Area Sh Repair Of Road By Providing Carpeting, Grouting, Patch Carpeting Inc Mtc. Of Road Side Drain Etc
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_62999_1 |
|
Reference Number |
29/EE-I/2025-26 |
| Tender Fee | 1000 |
| EMD | 48502 |
| Tender Value | - |
| Place | AGARTALA |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=64060 |
| Start Date | June 22, 2025 00:25 |
| End Date |
Expired
14/07/2025
Expired 458 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
R mtc of agartala water supply scheme within the jurisdiction of tjb division i during the year 2026 27
Construction of rcc protection wall drain and flooring of pump house at adarshapara dtw scheme under tjb sub division ii milansangha
Read moreR mtc of wtp under dws divn i agartala during the year 2026 27
Construction of boundary wall 75.00 mtr in north side of bordowali oht complex under dws sub divn no ii milansangha
Read moreDevelopment of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Development of ambassa colony road (l-2.65 km)/ sh- grouting, wbm-iii,re-carpeting, rcc retaining wall, pucca drain etc.
Read moreMaintenance and repairing of pipeline leakage, washing of pipeline, mtc. of hydrant inc. mtc. of sluice valve of existing water supply schemes at different locations of baishnabpur sector within the jurisdiction of dws sub-division, rupaichari
Maintenance and repairing of pipeline leakage, washing of pipeline, mtc. of hydrant inc. mtc. of sluice valve of existing water supply schemes at different locations of baishnabpur sector within the jurisdiction of dws sub-division, rupaichari
Read moreRunning mtc work of mi schemes under wr sub division ambassa under ambassa rd block. sh repairing of pvc pipeline inc replacement mtc of gi hydrant ci sluice valve etc for the year of 2026 27.
Running mtc work of mi schemes under wr sub division ambassa under ambassa rd block. sh repairing of pvc pipeline inc replacement mtc of gi hydrant ci sluice valve etc for the year of 2026 27.
Read moreDevelopment of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Development of road from nolongbari to tulabari l 5.00 km under padmabil block 24 ramchandraghat constituency during the year 2026 27 sh patch metalling, re carpeting, seal coat, surface drain, pucca drain, toe wall, cc block etc. gr i from ch.
Read morePatch repair work on various roads of sh mdr odr in dhaulana block of district hapur during the financial year 2026-27
Patch repair work on various roads of sh mdr odr in dhaulana block of district hapur during the financial year 2026-27
Read moreR/mtc of various wss undr mtb/ sh- mtc of pipe line, electrcl equipmnt, provdng drnkng wtr faclty at various gp/vc wthn mtb under dws sd no.- ii during the financial year 2026-27.
R/mtc of various wss undr mtb/ sh- mtc of pipe line, electrcl equipmnt, provdng drnkng wtr faclty at various gp/vc wthn mtb under dws sd no.- ii during the financial year 2026-27.
Read moreComprehensive maintenance of roads under sub division-i, ii, iii and iv of pwd division east road (m-212) during 2026-27. (sh- patch repair work).
Comprehensive maintenance of roads under sub division-i, ii, iii and iv of pwd division east road (m-212) during 2026-27. (sh- patch repair work).
Read moreDevelopment of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Read moreof your Industry type