Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kit For Repair Of Aws Opto Coupler Cards Of Track Magnets Comprising Of Components.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106285841 |
|
Reference Number |
92245095A |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/032024/106285841/viewNitPdf_4502241.pdf |
| Start Date | March 06, 2024 05:59 |
| End Date |
Expired
25/03/2024
Expired 938 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of identity cards for the use of track machines staff
Procurement of identity cards for the use of track machines staff
Read moreSet of magnet valve for escorts make ep unit and aws/dmh panel comprising of (1) application magnet valve complete
Set of magnet valve for escorts make ep unit and aws/dmh panel comprising of (1) application magnet valve complete
Read moreStripping, scraping, cleaning and washing of fiat bogies, bolsters and its components during ss-2 & ss-3 schedule & painting of fiat bogies, bolsters and its components during ss-2 & ss-3 schedule & dismantling, scrapping, cleaning and painting of centre buffer coupler (cbc) of lhb & icf coaches during the various shop schedule.
Stripping, scraping, cleaning and washing of fiat bogies, bolsters and its components during ss-2 & ss-3 schedule & painting of fiat bogies, bolsters and its components during ss-2 & ss-3 schedule & dismantling, scrapping, cleaning and painting of centre buffer coupler (cbc) of lhb & icf coaches during the various shop schedule.
Read moreHigh tensile aar-h type tight lock coupler with transition screw coupling for fitment on bg passenger coaches of indian railways and balanced draft gear, un-coupling devices, supporting device and other related components as per spec no rdso/2009/cg-22 rev-01.
High tensile aar-h type tight lock coupler with transition screw coupling for fitment on bg passenger coaches of indian railways and balanced draft gear, un-coupling devices, supporting device and other related components as per spec no rdso/2009/cg-22 rev-01.
Read moreComposite work (civil + p.way works) in connection with improvement and up-gradation of belha yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.
Composite work (civil + p.way works) in connection with improvement and up-gradation of belha yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.
Read moreComposite work (civil + p.way works) in connection with improvement and up-gradation of hathband yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/tilda.
Composite work (civil + p.way works) in connection with improvement and up-gradation of hathband yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/tilda.
Read moreComposite work (civil + p.way works) in connection with improvement and up-gradation of nipania yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.
Composite work (civil + p.way works) in connection with improvement and up-gradation of nipania yard (this work primarily involves improvement of yard drainage by construction of longitudinal & cross drain between running tracks. the p.way component includes layout correction, manual deep screening of plain track & turnouts and casual renewal of track components) under the jurisdiction of sse/p.way/bhatapara.
Read moreHq_med_cath_gte_zrc_zonal rate contract for supply of ph no:.(158300) ptca guide wire, tip load 0.6gf, tip radiopaque length 16cm, spring coil length 16cm, polymer sleeve with slip coat (hydrophilic coating) 17cm, 0.014 inch guide wire with distally tampered tip of 3cms of diameter 0.01 inch (0.26mm), composite core construction with multiple wire components comprising of rope coil
Hq_med_cath_gte_zrc_zonal rate contract for supply of ph no:.(158300) ptca guide wire, tip load 0.6gf, tip radiopaque length 16cm, spring coil length 16cm, polymer sleeve with slip coat (hydrophilic coating) 17cm, 0.014 inch guide wire with distally tampered tip of 3cms of diameter 0.01 inch (0.26mm), composite core construction with multiple wire components comprising of rope coil
Read moreConstruction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & com
Construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & com
Read moreConstruction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway
Read moreof your Industry type