Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Cr Cum Escape At Rd 8000 M On Nakshi Branch Canal Of Mokhabardi Lift Irrigation Scheme.
|
Description |
Construction Of Cr Cum Escape At Rd 8000 M On Nakshi Branch Canal Of Mokhabardi Lift Irrigation Scheme.
|
Organisation | CE Water Resources Department Gosikurda Project Nagpur | State Govt. and UT |
Tender Id | 2025_CEWRD_1165792_3 |
Reference Number |
Tender Notice No 13/2024-25 |
Tender Fee | 2860 |
EMD | 1.02 Lakh |
Tender Value | |
Place | Nakshi Branch Canal |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2026312 |
Start Date | March 28, 2025 17:00 |
End Date |
04/04/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Lining of w/c at outlet rd ...
Estimate for construction of w/c at outlet rd 2900/l direct barsola feeder in the land of dhan raj s/o gopala field to sadhu s/o ramchander field (14 acre) village baroda (under mplad scheme)
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Construction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Read moreFinishing work of construction of block-a residential cum commerical complux at scheme no 16 jda jabalpur
Finishing work of construction of block-a residential cum commerical complux at scheme no 16 jda jabalpur
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at nathana, district bathinda, punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at nathana, district bathinda, punjab under amrut 2.0 scheme
Read moreConsultancy services for preparing detailed project report solar con and synchronization of ringmo spang and baroo tsok lift irrigation scheme at baroo kargil district
Consultancy services for preparing detailed project report solar con and synchronization of ringmo spang and baroo tsok lift irrigation scheme at baroo kargil district&#x0d
Read moreConstruction of nbcc ph ii residential housing complex 3 towers of g plus 10 floors, lig and ews g plus 11 floors on epc basis with land measuring 10651.15 sqm 2.632 acres at bahadurpur, patna bihar on design, epc basis including o and m of 5 years
Construction of nbcc ph ii residential housing complex 3 towers of g plus 10 floors, lig and ews g plus 11 floors on epc basis with land measuring 10651.15 sqm 2.632 acres at bahadurpur, patna bihar on design, epc basis including o and m of 5 years
Read moreConstruction of cement concrete channel at spots for irrigation canal bearass drass under capex.
Construction of cement concrete channel at spots for irrigation canal bearass drass under capex.
Read moreDesign and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreof your Industry type