Tender Details

Particulars Details
Title
Engaging Tractors With Labour To Wown Planning Section For Removal Of C And D Waste, Debris And High Berms In Kakinada Municipal Corporation. (Recall)
Description
Engaging Tractors With Labour To Wown Planning Section For Removal Of C And D Waste, Debris And High Berms In Kakinada Municipal Corporation. (Recall)
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id 748692
Reference
Number
ROC.NO.2106/2024/E4
Tender Fee 295
EMD 8400
Tender Value
Place AP
Link https://tender.apeprocurement.gov.in
Start Date August 17, 2024 19:30
End Date

27/08/2024 ( Expired 297 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Read more
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Read more
Construction of proposed 18 tpd municipal wet and dry waste processing plant, leachate tank with rain water harvesting unit...other ancillary works for proposed 18 tpd municipal waste processing plant under swm project within baruipur municipality.

Construction of proposed 18 tpd municipal wet and dry waste processing plant, leachate tank with rain water harvesting unit...other ancillary works for proposed 18 tpd municipal waste processing plant under swm project within baruipur municipality.

Read more
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.

Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise