Engaging Technical Consultant For Prep Of (Fs) And (Dpr) On Epc Mode For Constr Of Rd Siyum Menchuka (New Alignment) Km 0.00 To 80.00 (Net 80.00 Km) Green Field Alignment To Nhdl Specifications In The Aor Of 77 Rcc Under 23 Tf ( P) Ank In A. P
|
Description |
Engaging Technical Consultant For Prep Of (Fs) And (Dpr) On Epc Mode For Constr Of Rd Siyum Menchuka (New Alignment) Km 0.00 To 80.00 (Net 80.00 Km) Green Field Alignment To Nhdl Specifications In The Aor Of 77 Rcc Under 23 Tf ( P) Ank In A. P
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id | 2024_BRO_663813_1 |
Reference Number |
ANK/NIT-01/2024-25 |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | At Km 0.00 to 80.00SIYUM-MENCHUKA Rd |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=742364 |
Start Date | July 29, 2024 17:30 |
End Date |
16/08/2024 ( Expired 247 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd
Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of imb between bp-168 to bp-175 (length - 74.70 km) including constr of approach rd
Read moreConstr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Constr impvt of existing road sansari killar thirot tandi cl 9 to nhdl specs from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 brtf project deepak in lahaul spiti distt in the state of hp on epc
Read moreCs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp
Cs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp
Read moreUpgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Upgradation of road budhal mahoregul from existing chainage km 65.880 to km 86.725 (design chainage km 53.250 to km 88.200 net length 34.950 km package iii to nhdl specification under p sampark in ut of j k on epc mode
Read moreStrengt and rectification of accident prone loc for rd safety at km 24.2, 25,25.5 of reddy zig and river training wrks at km 27.2 on rd tcc under 128rcc/23tf under (p) ank in upper subansiri distt of a. p through epc mode (job no. 106/102/ark)
Strengt and rectification of accident prone loc for rd safety at km 24.2, 25,25.5 of reddy zig and river training wrks at km 27.2 on rd tcc under 128rcc/23tf under (p) ank in upper subansiri distt of a. p through epc mode (job no. 106/102/ark)
Read moreCs for prep of dpr and provid pre constr activities for const of rd nurbo sumdo kiato to nhdl spec for 45 km lgth 30 km away from nurbo sumdo km 30pt00 to km 75pt00 kiato incl 05 km two dimen tnl incl detail fs for tnl at taklingla pass under p dpk
Cs for prep of dpr and provid pre constr activities for const of rd nurbo sumdo kiato to nhdl spec for 45 km lgth 30 km away from nurbo sumdo km 30pt00 to km 75pt00 kiato incl 05 km two dimen tnl incl detail fs for tnl at taklingla pass under p dpk
Read moreConstr on epc mode of greenfield alignment to nhdl specn with paved shoulders from naku km 0.000 to nakula km 9.130 of total design length 9.130 km on road chungthang-lachen monastry log bridge muguthang naku section part of nh 310 ag in the state o
Constr on epc mode of greenfield alignment to nhdl specn with paved shoulders from naku km 0.000 to nakula km 9.130 of total design length 9.130 km on road chungthang-lachen monastry log bridge muguthang naku section part of nh 310 ag in the state o
Read moreProv,lay,spread nd comp of rdymde bitumin(hmp) mix for bm 50 mm tk layer,bc 30 mm tk layer,aw rd mrking wt tp paint 2.5 mm tk for resurf wks bet km 69.940-72.000 on dhar-udhampur rd (net length 2.060 km and 3.671 km eqvt cl-9) in 69 rcc 35 tf p spk
Prov,lay,spread nd comp of rdymde bitumin(hmp) mix for bm 50 mm tk layer,bc 30 mm tk layer,aw rd mrking wt tp paint 2.5 mm tk for resurf wks bet km 69.940-72.000 on dhar-udhampur rd (net length 2.060 km and 3.671 km eqvt cl-9) in 69 rcc 35 tf p spk
Read moreBm 50 mm thick, bc 30 mm thick all compacted rd marking with tp paint 2.5 mm thick for resurf wks bet km 0.00 to 10.600 on kulwanta rc peak rd in 69 rcc under 35 tf (p) sampark in jk
Bm 50 mm thick, bc 30 mm thick all compacted rd marking with tp paint 2.5 mm thick for resurf wks bet km 0.00 to 10.600 on kulwanta rc peak rd in 69 rcc under 35 tf (p) sampark in jk
Read moreCons of rd changmachan - tso - tsogsalu to nh single lane spe fm km 12.00 to km 52.35 (40.35 km) epc mode (7.45 mtrs fmn wd) under 113 rcc/50 brtf/project himank in u t of ladakh (km 0.00 reckoned from tsogsalu)
Cons of rd changmachan - tso - tsogsalu to nh single lane spe fm km 12.00 to km 52.35 (40.35 km) epc mode (7.45 mtrs fmn wd) under 113 rcc/50 brtf/project himank in u t of ladakh (km 0.00 reckoned from tsogsalu)
Read moreof your Industry type